Home Projects More like: Validation & Verification for Critical Heat Flux and CFD [Clear] # Title Funder Funding Start End Status 1 A low-cost computer cluster for the calculation of atomic data of importance in plasma physics EPSRC £161,005 March 1, 2010 Feb. 29, 2012 Closed 2 Engineered Zircaloy Cladding Modifications for Improved Accident Tolerance of LWR Fuel EPSRC £4,951,495 Aug. 31, 2013 Dec. 31, 2016 Closed 3 Mixed-Mode Fatigue Crack Studies EPSRC £35,130 April 4, 2010 Sept. 3, 2010 Closed 4 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC £527,622 March 1, 2016 Aug. 22, 2019 Closed 5 Study of chemical interactions at the early stage of aviation fuel surface deposition using ab initio density functional theory EPSRC £0 Jan. 4, 2022 Jan. 3, 2026 Active 6 MAINTAiN - Multi-scAle INTegrity assessment for Advanced high-temperature Nuclear systems EPSRC £1,970,165 March 31, 2018 Sept. 30, 2022 Closed 7 G8-2012 Structural Bamboo Products EPSRC £845,504 Feb. 1, 2013 Jan. 31, 2016 Closed 8 G8 Multilateral Research Funding Nu-FuSE EPSRC £1,976,510 April 3, 2011 Sept. 30, 2014 Closed 9 enabling Sixty Years creep-fatigue life of the NExt generation nuclear Reactors 'SYNERgy' EPSRC £6,236,305 March 1, 2019 Feb. 28, 2025 Active 10 Modelling Marine Renewable Energy Devices; Designing for Survivability EPSRC £5,198,085 June 29, 2012 Dec. 29, 2015 Closed 11 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC £342,860 Feb. 1, 2016 Dec. 31, 2019 Closed 12 On the Development of a Novel Approach in Modelling of Turbulent Pulsating Flows EPSRC £518,960 June 30, 2020 Dec. 31, 2022 Active 13 On the Development of a Novel Approach in Modelling of Turbulent Pulsating Flows EPSRC £1,297,400 June 30, 2020 March 31, 2023 Closed 14 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £982,574 March 17, 2016 March 16, 2020 Closed 15 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £2,456,435 March 17, 2016 March 16, 2020 Closed 16 UNIGRAF: Understanding and Improving Graphite for Nuclear Fission EPSRC £2,437,695 Aug. 23, 2015 Feb. 23, 2019 Closed 17 Realising the Commercial Potential of the Multi-Physics and Multi-Scale FETCH Technology for Nuclear Safety Applications EPSRC £529,605 Aug. 31, 2010 Aug. 31, 2011 Closed 18 CCP Flagship: A radiation-hydrodynamics code for the UK laser-plasma community EPSRC £596,042 March 30, 2015 March 29, 2018 Closed 19 CCP Flagship: A radiation-hydrodynamics code for the UK laser-plasma community EPSRC £1,490,105 March 30, 2015 March 30, 2018 Closed 20 Reactor core-structure re-location modelling for severe nuclear accidents EPSRC £1,220,355 Nov. 30, 2014 April 29, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 »