# Title Funder Funding Start End Status
61 CRIS-TRAP: a gas-filled linear Paul trap for the CRIS experiment at ISOLDE STFC
£375,000
Sept. 30, 2018 March 31, 2019 Closed
62 Isolation of 14C species from spent ion exchange resins and their stabilisation EPSRC
£1,930,815
Aug. 31, 2019 Aug. 31, 2022 Closed
63 Behaviour of UK Specific Spent Fuels Under Conditions Relevant to Geological Disposal. EPSRC
£3,644,210
Aug. 23, 2011 Jan. 31, 2016 Closed
64 Development of a High Flux Accelerator-Driven Neutron Irradiation Facility for Nuclear Plant Materials and Applied Neutron Science EPSRC
£43,848,865
Nov. 1, 2019 March 31, 2024 Active
65 Novel intensified liquid-liquid contactors for mass transfer in sustainable energy generation. EPSRC
£395,448
May 31, 2017 Dec. 31, 2018 Closed
66 Novel intensified liquid-liquid contactors for mass transfer in sustainable energy generation. EPSRC
£988,620
May 31, 2017 Dec. 31, 2018 Closed
67 Glass-Ceramic Wasteforms for High Level Wastes from Advanced Nuclear Fuel Reprocessing EPSRC
£2,099,865
Jan. 1, 2016 Oct. 21, 2019 Closed
68 Development of Unified Experimental and Theoretical Approach to Predict Reactive Transport in Subsurface Porous Media EPSRC
£1,973,135
March 31, 2014 Sept. 30, 2017 Closed
69 Adaptive hierarchical radiation transport methods to meet future challenges in reactor physics EPSRC
£5,796,670
Dec. 1, 2011 Nov. 30, 2015 Closed
70 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£982,574
March 17, 2016 March 16, 2020 Closed
71 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£2,456,435
March 17, 2016 March 16, 2020 Closed
Reset