Home Projects More like: Atomic and Macro-scale Studies of Surface Processes: Towards a Mechanistic Understanding of Surface Reactivity and Radionuclide Binding Mechanisms [Clear] # Title Funder Funding Start End Status 61 CRIS-TRAP: a gas-filled linear Paul trap for the CRIS experiment at ISOLDE STFC £375,000 Sept. 30, 2018 March 31, 2019 Closed 62 Isolation of 14C species from spent ion exchange resins and their stabilisation EPSRC £1,930,815 Aug. 31, 2019 Aug. 31, 2022 Closed 63 Behaviour of UK Specific Spent Fuels Under Conditions Relevant to Geological Disposal. EPSRC £3,644,210 Aug. 23, 2011 Jan. 31, 2016 Closed 64 Development of a High Flux Accelerator-Driven Neutron Irradiation Facility for Nuclear Plant Materials and Applied Neutron Science EPSRC £43,848,865 Nov. 1, 2019 March 31, 2024 Active 65 Novel intensified liquid-liquid contactors for mass transfer in sustainable energy generation. EPSRC £395,448 May 31, 2017 Dec. 31, 2018 Closed 66 Novel intensified liquid-liquid contactors for mass transfer in sustainable energy generation. EPSRC £988,620 May 31, 2017 Dec. 31, 2018 Closed 67 Glass-Ceramic Wasteforms for High Level Wastes from Advanced Nuclear Fuel Reprocessing EPSRC £2,099,865 Jan. 1, 2016 Oct. 21, 2019 Closed 68 Development of Unified Experimental and Theoretical Approach to Predict Reactive Transport in Subsurface Porous Media EPSRC £1,973,135 March 31, 2014 Sept. 30, 2017 Closed 69 Adaptive hierarchical radiation transport methods to meet future challenges in reactor physics EPSRC £5,796,670 Dec. 1, 2011 Nov. 30, 2015 Closed 70 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £982,574 March 17, 2016 March 16, 2020 Closed 71 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £2,456,435 March 17, 2016 March 16, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »