Home Projects More like: Blade Integrated Optics For Offshore Wind LIDAR (BIOFOWL) [Clear] # Title Funder Funding Start End Status 1 Direct Fibre Optic Shape Sensing for Large Scale Engineering Structures EPSRC £4,136,298 Sept. 30, 2021 Sept. 29, 2025 Active 2 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK £194,266 Aug. 31, 2022 Sept. 29, 2023 Active 3 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK £971,330 Aug. 31, 2022 Sept. 30, 2023 Closed 4 Real time measurement of sample erosion Innovate UK £16,236 July 31, 2017 Jan. 31, 2018 Closed 5 Wake Anemometry for Yaw control: laboratory Demonstration, Ruggedisation and Field Testing Innovate UK £299,984 Sept. 30, 2016 Dec. 31, 2017 Closed 6 High tEmperature blAde Tip-clearance (HEAT) Innovate UK £700,000 Sept. 30, 2018 June 29, 2021 Closed 7 An experimental investigation in to the effect of rotor endwall contouring on gas turbine stage efficiency in the presence of egress purge flow EPSRC £0 Sept. 30, 2018 March 31, 2019 Closed 8 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £652,520 Jan. 5, 2009 July 3, 2012 Closed 9 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £1,631,300 Jan. 5, 2009 July 4, 2012 Closed 10 Erosion Sensors for continuous monitoring of coatings (EROSCANS) Innovate UK £232,366 Sept. 30, 2017 Dec. 31, 2018 Closed 11 In-service X-ray radiography of offshore wind blades (RADBLAD) Innovate UK £1,540,542 March 31, 2019 June 29, 2021 Closed 12 In-service X-ray radiography of offshore wind blades (RADBLAD) ISCF £3,851,355 March 31, 2019 June 30, 2021 Closed 13 Multi-Platform Inspection Maintenance & Repair In Extreme Environment (MIMRee) Innovate UK £5,975,106 March 1, 2019 May 30, 2021 Closed 14 Multi-Platform Inspection Maintenance & Repair In Extreme Environment (MIMRee) ISCF £14,937,765 March 1, 2019 May 31, 2021 Closed 15 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £2,943,394 Jan. 1, 2019 Dec. 31, 2020 Closed 16 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £7,287,715 Jan. 1, 2019 Dec. 31, 2020 Closed 17 Valid8 Turbine Inspection Innovate UK £66,016 March 1, 2020 Dec. 31, 2020 Closed 18 Micron Resolution Full-Field Shape Metrology for High Value Engineering Applications EPSRC £153,934 Aug. 31, 2007 Sept. 29, 2008 Closed 19 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £590,322 Feb. 1, 2020 June 29, 2021 Closed 20 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £1,475,805 Feb. 1, 2020 June 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »