Home Projects More like: Beyond Ubiquitous: The role of Wide Band-gap Semiconductors in Electric Aircraft [Clear] # Title Funder Funding Start End Status 1 Beyond Ubiquitous: The role of Wide Band-gap Semiconductors in Electric Aircraft Innovate UK £49,904 Feb. 1, 2022 April 29, 2022 Closed 2 High-reliability Electronics for Robust Operation (HERO) Innovate UK £33,846 Sept. 30, 2022 March 30, 2023 Active 3 Multi-Domain Virtual Prototyping Techniques for Wide-Bandgap Power Electronics EPSRC £2,158,516 Nov. 24, 2017 Nov. 23, 2021 Closed 4 Multi-Domain Virtual Prototyping Techniques for Wide-Bandgap Power Electronics EPSRC £5,396,290 Nov. 24, 2017 Nov. 23, 2021 Closed 5 Underpinning Power Electronics 2017: Heterogeneous Integration EPSRC £2,709,924 Nov. 1, 2017 April 28, 2022 Closed 6 Underpinning Power Electronics 2017: Heterogeneous Integration EPSRC £6,774,810 Nov. 1, 2017 April 29, 2022 Closed 7 Development of an Application Interface for Wide Bandgap Semiconductor Simulation Tool Innovate UK £249,215 May 31, 2023 Nov. 30, 2023 Active 8 Development of Silicon Carbide devices for next generation surge protection circuitry and power electronics EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 9 Evaluation of beta-Ga2O3 for high power RF device applications EPSRC £509,498 Sept. 30, 2019 March 30, 2021 Closed 10 Deposition of Tantalum Carbide (TaC) on graphite as a coating barrier during the manufacture of Silicon Carbide (SiC) electronic materials UKRI £1,591,454 Nov. 4, 2020 Nov. 3, 2024 Active 11 Deposition of Tantalum Carbide (TaC) on graphite as a coating barrier during the manufacture of Silicon Carbide (SiC) electronic materials FLF £3,978,635 Nov. 4, 2020 Nov. 3, 2024 Active 12 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £2,436,242 Sept. 30, 2017 Dec. 31, 2021 Closed 13 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £6,090,605 Sept. 30, 2017 Dec. 31, 2021 Closed 14 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £199,530 April 16, 2013 Aug. 15, 2015 Closed 15 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £498,825 April 16, 2013 Aug. 16, 2015 Closed 16 EPSRC Centre for Doctoral Training for Sustainable Electric Propulsion (CDT SEP) EPSRC £10,807,385 March 31, 2019 Sept. 29, 2027 Active 17 EPSRC Centre for Doctoral Training for Sustainable Electric Propulsion (CDT SEP) EPSRC £27,437,912 March 31, 2019 Sept. 30, 2027 Active 18 High-Density Active Silicon Carbide Power Electronics: Enabling Responsive Power Conversion EPSRC £1,255,812 Dec. 1, 2023 Nov. 30, 2026 Active 19 Exploration of Multilevel Current Source Converters EPSRC £195,774 June 29, 2014 March 30, 2016 Closed 20 Exploration of Multilevel Current Source Converters EPSRC £489,435 June 29, 2014 March 31, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »