# Title Funder Funding Start End Status
1 Research into the feasibility of using battolysers to produce green hydrogen EPSRC
£0
Jan. 1, 2022 June 29, 2025 Active
2 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC
£162,381
Sept. 30, 2022 March 31, 2024 Active
3 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC
£88,585
May 31, 2022 Nov. 30, 2023 Active
4 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC
£811,905
Sept. 30, 2022 March 31, 2024 Active
5 Integrating a mixed energy vector battolyser into a microgrid NERC
£12,770
Aug. 31, 2022 Aug. 30, 2023 Active
6 Integrating a mixed energy vector battolyser into a microgrid NERC
£63,850
Aug. 31, 2022 Aug. 31, 2023 Closed
7 MASBAH (Making affordable solar, battolyser and hydrogen) Innovate UK
£482,169
Sept. 30, 2021 Sept. 29, 2022 Closed
8 Project Centurion Feasibility Study Innovate UK
£445,595
Sept. 30, 2018 March 30, 2020 Closed
9 Project Centurion Feasibility Study Innovate UK
£1,115,550
Sept. 30, 2018 March 31, 2020 Closed
10 ISCF Wave 1: (The JUICED Hub [Joint University Industry Consortium for Energy (Materials) and Devices Hub]) EPSRC
£3,664,442
Nov. 8, 2017 Nov. 6, 2021 Closed
11 ISCF Wave 1: (The JUICED Hub [Joint University Industry Consortium for Energy (Materials) and Devices Hub]) UUI
£9,161,105
Nov. 8, 2017 Nov. 6, 2021 Closed
12 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£706,292
Dec. 8, 2014 Dec. 7, 2017 Closed
13 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£602,472
Dec. 31, 2014 June 29, 2018 Closed
14 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK
£812,924
Aug. 31, 2022 Aug. 30, 2024 Active
15 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK
£4,064,620
Aug. 31, 2022 Aug. 31, 2024 Active
16 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£217,826
Nov. 1, 2022 April 29, 2024 Active
17 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£1,089,130
Nov. 1, 2022 April 30, 2024 Active
18 Design optimisation for solar to green hydrogen plants Innovate UK
£397,915
March 1, 2023 Aug. 31, 2023 Closed
19 TANK EPSRC
£180,488
Dec. 1, 2015 Feb. 28, 2017 Closed
20 TANK EPSRC
£451,220
Dec. 1, 2015 Feb. 28, 2017 Closed
Reset