Home Projects More like: Research into the feasibility of using battolysers to produce green hydrogen [Clear] # Title Funder Funding Start End Status 1 Research into the feasibility of using battolysers to produce green hydrogen EPSRC £0 Jan. 1, 2022 June 29, 2025 Active 2 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £162,381 Sept. 30, 2022 March 31, 2024 Active 3 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £88,585 May 31, 2022 Nov. 30, 2023 Active 4 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £811,905 Sept. 30, 2022 March 31, 2024 Active 5 Integrating a mixed energy vector battolyser into a microgrid NERC £12,770 Aug. 31, 2022 Aug. 30, 2023 Active 6 Integrating a mixed energy vector battolyser into a microgrid NERC £63,850 Aug. 31, 2022 Aug. 31, 2023 Closed 7 MASBAH (Making affordable solar, battolyser and hydrogen) Innovate UK £482,169 Sept. 30, 2021 Sept. 29, 2022 Closed 8 Project Centurion Feasibility Study Innovate UK £445,595 Sept. 30, 2018 March 30, 2020 Closed 9 Project Centurion Feasibility Study Innovate UK £1,115,550 Sept. 30, 2018 March 31, 2020 Closed 10 ISCF Wave 1: (The JUICED Hub [Joint University Industry Consortium for Energy (Materials) and Devices Hub]) EPSRC £3,664,442 Nov. 8, 2017 Nov. 6, 2021 Closed 11 ISCF Wave 1: (The JUICED Hub [Joint University Industry Consortium for Energy (Materials) and Devices Hub]) UUI £9,161,105 Nov. 8, 2017 Nov. 6, 2021 Closed 12 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £706,292 Dec. 8, 2014 Dec. 7, 2017 Closed 13 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £602,472 Dec. 31, 2014 June 29, 2018 Closed 14 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK £812,924 Aug. 31, 2022 Aug. 30, 2024 Active 15 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK £4,064,620 Aug. 31, 2022 Aug. 31, 2024 Active 16 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC £217,826 Nov. 1, 2022 April 29, 2024 Active 17 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC £1,089,130 Nov. 1, 2022 April 30, 2024 Active 18 Design optimisation for solar to green hydrogen plants Innovate UK £397,915 March 1, 2023 Aug. 31, 2023 Closed 19 TANK EPSRC £180,488 Dec. 1, 2015 Feb. 28, 2017 Closed 20 TANK EPSRC £451,220 Dec. 1, 2015 Feb. 28, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »