Home Projects More like: EPSRC Centre for Doctoral Training in Energy Storage and its Applications [Clear] # Title Funder Funding Start End Status 21 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £6,693,595 July 10, 2013 April 28, 2017 Closed 22 The Active Building Centre EPSRC £71,894,854 Sept. 2, 2018 May 6, 2020 Closed 23 ISCF Wave 1: High Power Material Hybridised Battery (HiPoBat) EPSRC £1,157,184 Nov. 9, 2017 May 7, 2021 Closed 24 ISCF Wave 1: High Power Material Hybridised Battery (HiPoBat) UUI £2,892,960 Nov. 9, 2017 May 8, 2021 Closed 25 Vacancy Engineering in Anode Materials for High-Power K-Ion Batteries EPSRC £779,946 March 3, 2021 March 2, 2024 Active 26 Vacancy Engineering in Anode Materials for High-Power K-Ion Batteries EPSRC £1,949,865 March 3, 2021 March 2, 2024 Active 27 Next Generation Grid Scale Thermal Energy Storage Technologies (NexGen-TEST) EPSRC £1,969,690 April 29, 2014 Oct. 28, 2017 Closed 28 Next Generation Grid Scale Thermal Energy Storage Technologies (NexGen-TEST) EPSRC £4,924,225 April 29, 2014 Oct. 29, 2017 Closed 29 Novel Flexible Materials for Sustainable Energy Storage EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 30 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £7,051,488 March 31, 2014 Sept. 13, 2024 Active 31 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £17,639,430 March 31, 2014 Sept. 14, 2024 Active 32 Ultra-Reduced Polyoxometalates as Electron-Coupled-Proton-Systems for Energy Storage EPSRC £1,124,112 June 30, 2018 June 29, 2021 Closed 33 Ultra-Reduced Polyoxometalates as Electron-Coupled-Proton-Systems for Energy Storage EPSRC £2,810,280 June 30, 2018 June 30, 2021 Closed 34 Energy Storage for Low Carbon Grids EPSRC £11,242,032 Sept. 30, 2012 June 29, 2018 Closed 35 Energy Storage for Low Carbon Grids EPSRC £28,105,080 Sept. 30, 2012 June 30, 2018 Closed 36 Generation Integrated Energy Storage - A Paradigm Shift EPSRC £665,292 June 30, 2017 June 29, 2022 Closed 37 Generation Integrated Energy Storage - A Paradigm Shift EPSRC £1,663,230 June 30, 2017 June 30, 2022 Closed 38 Structuring the Future - Underpinning world-leading science in EaStCHEM through cutting edge characterisation EPSRC £1,961,384 Jan. 1, 2013 March 31, 2013 Closed 39 Battery/Supercapacitor Hybrids for Transport Energy Storage EPSRC £757,660 July 31, 2011 July 30, 2013 Closed 40 Battery/Supercapacitor Hybrids for Transport Energy Storage EPSRC £1,894,150 July 31, 2011 July 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »