Home Projects More like: Advanced Infrastructure Modelling System (AIMS) [Clear] # Title Funder Funding Start End Status 21 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 22 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 23 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 24 WIND Electric Revolution (WINDER) Innovate UK £726,920 Nov. 1, 2020 Oct. 30, 2021 Closed 25 WIND Electric Revolution (WINDER) ISCF £1,817,300 Nov. 1, 2020 Oct. 31, 2021 Closed 26 An innovative, sustainable micro-wind turbine-energy storage system that harnesses wind energy to reduce electricity bills by £68K and emissions by 180,000 kg of CO2 per year Innovate UK £489,765 March 31, 2023 Sept. 30, 2023 Closed 27 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 28 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 29 Dynamics of Mooring System for Floating Offshore Wind Turbine (FOWT) EPSRC £0 Jan. 1, 2018 Sept. 29, 2021 Closed 30 Dynamics of Mooring System for Floating Offshore Wind Turbine (FOWT) EPSRC, NERC £0 Jan. 1, 2018 Sept. 30, 2021 Closed 31 VIETNAMESE-FARM-CLEAN-MICROGRID Innovate UK £1,263,665 March 31, 2023 March 31, 2024 Active 32 Designing actively robust products with Bayesian Optimisation EPSRC £0 Sept. 26, 2021 Sept. 29, 2025 Active 33 Designing actively robust products with Bayesian Optimisation EPSRC £0 Oct. 3, 2021 Dec. 30, 2025 Active 34 Scour Prevention Trial Reference number Innovate UK £213,548 May 31, 2011 May 30, 2013 Closed 35 Scour Prevention Trial Reference number Innovate UK £533,870 May 31, 2011 May 31, 2013 Closed 36 MOSAIC (Monitoring, Scanning and Active Inspection of Cables) Innovate UK £985,508 Dec. 1, 2013 Nov. 30, 2016 Closed 37 wind turbines EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 38 ElecTurSys2 Innovate UK £637,566 March 31, 2018 Dec. 31, 2020 Closed 39 Distributed gas sensing using hollow core optical fibre EPSRC £1,097,420 Nov. 1, 2022 July 1, 2026 Active 40 Distributed gas sensing using hollow core optical fibre EPSRC £860,840 Nov. 1, 2022 April 29, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »