Home Projects More like: Condition Monitoring Power Electronics for Reliability (COMPERE) [Clear] # Title Funder Funding Start End Status 61 Interconnection of residential buildings using solid-state power electronic converters Innovate UK £110,595 Aug. 31, 2013 Oct. 31, 2013 Closed 62 Silicon Carbide MOSFETs EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 63 Silicon Carbide MOSFETs EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Closed 64 Gallium Nitride Smart Power Integrated Circuit Technology (GaN SPICe) EPSRC £1,004,940 Sept. 30, 2021 March 30, 2025 Active 65 Gallium Nitride Smart Power Integrated Circuit Technology (GaN SPICe) EPSRC £721,634 Sept. 30, 2021 March 30, 2025 Active 66 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 67 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 Dec. 31, 2024 Active 68 Development of an Application Interface for Wide Bandgap Semiconductor Simulation Tool Innovate UK £249,215 May 31, 2023 Nov. 30, 2023 Active 69 Control of inverter-based distributed generation in low-inertia power systems EPSRC £0 Sept. 29, 2019 March 30, 2023 Active 70 Control of inverter-based distributed generation in low-inertia power systems EPSRC £0 Sept. 29, 2019 June 30, 2023 Closed 71 A Complete HV Network Condition Monitoring System for Oil & Gas Facilities Innovate UK £200,000 March 1, 2012 Feb. 28, 2013 Closed 72 PEARGaN - Power Electronics Applications for Reliability in GaN Innovate UK £1,075,182 Sept. 30, 2012 March 30, 2015 Closed 73 Ultra-high voltage (>30KV) power devices through superior materials for HVDC transmission EPSRC £1,453,046 June 30, 2017 Jan. 20, 2021 Closed 74 Ultra-high voltage (>30KV) power devices through superior materials for HVDC transmission EPSRC £3,632,615 June 30, 2017 Jan. 20, 2021 Closed 75 Next generation monitoring for enhanced asset management EPSRC £0 Sept. 30, 2016 March 30, 2021 Closed 76 Next generation monitoring for enhanced asset management EPSRC £0 Sept. 30, 2016 March 31, 2021 Closed 77 ASSIST - Advanced Sic based SolId State Transformer Innovate UK £2,185,338 Feb. 1, 2022 July 30, 2024 Active 78 Plug-and-play Low Voltage DC Microgrid for Cheap and Clean Energy EPSRC £828,692 July 31, 2019 April 29, 2022 Closed 79 Plug-and-play Low Voltage DC Microgrid for Cheap and Clean Energy EPSRC £1,034,726 June 28, 2018 April 29, 2019 Closed 80 Feasibility Assessment of a New Ultra-High Voltage Silicon Carbide Thyristor Technology for Multi-Megawatt Wind Turbines' Power Electronics Converters Innovate UK £229,114 June 30, 2013 June 29, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »