Home Projects More like: Intelligent Prediction for Cargo Traffic Routing (iPrediCTOR) [Clear] # Title Funder Funding Start End Status 81 Predicting cloud cover and solar intensity at PV sites to improve performance of the Low Voltage distribution network Innovate UK £213,820 March 1, 2018 Feb. 28, 2019 Closed 82 Predicting cloud cover and solar intensity at PV sites to improve performance of the Low Voltage distribution network Innovate UK £534,550 March 1, 2018 Feb. 28, 2019 Closed 83 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 84 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 85 Design control system for ATL's passive air lubrication System Innovate UK £48,485 Sept. 30, 2022 March 30, 2023 Active 86 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £1,589,160 Sept. 30, 2021 Sept. 29, 2024 Active 87 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active 88 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £9,965,976 March 31, 2010 Dec. 31, 2015 Closed 89 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £18,543,684 March 31, 2010 Dec. 31, 2015 Closed 90 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £30,906,140 March 31, 2010 Dec. 31, 2015 Closed 91 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £16,609,960 March 31, 2010 Dec. 31, 2015 Closed 92 FROTH: Fundamentals and Reliability of Offshore Structure Hydrodynamics EPSRC £2,180,560 Nov. 1, 2012 Oct. 31, 2015 Closed 93 Wind turbine sensor placement optimisation for digital twin development (OSP) Innovate UK £882,081 March 31, 2021 Oct. 31, 2022 Active 94 (HeRO) Hybrid-enabled Remote Operations Innovate UK £525,842 Aug. 31, 2021 March 30, 2022 Active 95 Intelligent Transport Systems and Services: Informed Logistics EPSRC £626,852 Aug. 31, 2010 Nov. 30, 2012 Closed 96 IRD heavy minerals as a provenance tool for ice coverage on Greenland NERC £58,094 July 31, 2010 July 30, 2011 Closed 97 IRD heavy minerals as a provenance tool for ice coverage on Greenland NERC £145,235 July 31, 2010 July 31, 2011 Closed 98 SiemensEPSRC Digital Twin with Data-Driven Predictive Control: Unlocking Flexibility of Industrial Plants for Supporting a Net Zero Electricity System EPSRC £100,754 Dec. 1, 2021 Nov. 30, 2022 Active 99 SiemensEPSRC Digital Twin with Data-Driven Predictive Control: Unlocking Flexibility of Industrial Plants for Supporting a Net Zero Electricity System EPSRC £251,885 March 1, 2022 Nov. 30, 2022 Closed 100 Offshore Cable Burial: How deep is deep enough? EPSRC £781,144 Feb. 14, 2022 Aug. 12, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »