Home Projects More like: Minigrid Management System Development & Trials [Clear] # Title Funder Funding Start End Status 81 Brownie – the home and community energy little helper that ‘lends a hand’ Innovate UK £325,830 Feb. 1, 2017 Jan. 31, 2018 Closed 82 Coordination of distributed energy storage and demand side response to offer flexibility in modern energy networks EPSRC £0 Sept. 24, 2017 Sept. 29, 2020 Closed 83 Coordination of distributed energy storage and demand side response to offer flexibility in modern energy networks EPSRC £0 Sept. 30, 2017 Sept. 30, 2020 Closed 84 Intelligent MicroGrids with Appropriate Storage for Energy (IMASE) EPSRC £1,421,416 May 31, 2014 Nov. 30, 2017 Closed 85 Intelligent MicroGrids with Appropriate Storage for Energy (IMASE) EPSRC £3,553,540 May 31, 2014 Nov. 30, 2017 Closed 86 "Bee-Smart" - Powerhive's Smart-Grid Software Innovate UK £4,130,250 March 1, 2023 Aug. 31, 2024 Active 87 Evaluating the network stability using probabilistic modelling of the future e-mobility ecosystem in urban areas EPSRC £0 May 31, 2022 May 30, 2026 Active 88 Evaluating the network stability using probabilistic modelling of the future e-mobility ecosystem in urban areas EPSRC £0 May 31, 2022 May 31, 2026 Active 89 Modelling energy flexibility in Britain's future energy systems EPSRC £0 Sept. 8, 2019 March 31, 2025 Active 90 Modelling energy flexibility in Britain's future energy systems EPSRC £0 Sept. 8, 2019 April 1, 2025 Active 91 Grid integration of multiple flywheel energy storage systems Innovate UK £197,166 March 1, 2014 Feb. 28, 2015 Closed 92 Grid integration of multiple flywheel energy storage systems Innovate UK £492,915 March 1, 2014 Feb. 28, 2015 Closed 93 Predicting cloud cover and solar intensity at PV sites to improve performance of the Low Voltage distribution network Innovate UK £213,820 March 1, 2018 Feb. 28, 2019 Closed 94 Predicting cloud cover and solar intensity at PV sites to improve performance of the Low Voltage distribution network Innovate UK £534,550 March 1, 2018 Feb. 28, 2019 Closed 95 Establishing Mutually Beneficial Local Energy Markets (EMBLEM) Phase 2 Innovate UK £1,120,974 May 31, 2019 Nov. 30, 2021 Closed 96 Establishing Mutually Beneficial Local Energy Markets (EMBLEM) Phase 2 Innovate UK £2,802,435 May 31, 2019 Nov. 30, 2021 Closed 97 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £585,150 March 25, 2015 Jan. 31, 2017 Closed 98 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £269,154 Feb. 1, 2017 March 24, 2018 Closed 99 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £672,885 Feb. 1, 2017 March 24, 2018 Closed 100 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £1,462,875 March 25, 2015 Jan. 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »