Home Projects More like: Tidal Stream Energy - Designing for Performance [Clear] # Title Funder Funding Start End Status 21 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £460,570 Sept. 30, 2010 March 31, 2013 Closed 22 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £1,151,425 Sept. 30, 2010 March 31, 2013 Closed 23 Learning tidal currents EPSRC £196,414 June 21, 2015 Dec. 21, 2016 Closed 24 Learning tidal currents EPSRC £491,035 June 21, 2015 Dec. 21, 2016 Closed 25 Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) EPSRC £1,607,090 June 30, 2016 March 30, 2020 Closed 26 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £1,709,364 Sept. 27, 2012 Feb. 27, 2016 Closed 27 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £4,273,410 Sept. 27, 2012 Feb. 27, 2016 Closed 28 X-Rotor Offshore Wind Turbine EPSRC £235,982 April 30, 2017 Oct. 31, 2018 Closed 29 X-Rotor Offshore Wind Turbine EPSRC £589,955 April 30, 2017 Oct. 31, 2018 Closed 30 Modelling the eco-hydraulic impacts of tidal energy projects NERC £62,988 Nov. 1, 2017 April 29, 2018 Closed 31 Modelling the eco-hydraulic impacts of tidal energy projects NERC £157,470 Nov. 1, 2017 April 30, 2018 Closed 32 Dynamic loading, operation, and yield maximization of tidal turbines EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 33 Development of a standardised marine mammal monitoring system for the tidal energy industry NERC £707,492 Jan. 1, 2018 Dec. 31, 2021 Closed 34 Development of a standardised marine mammal monitoring system for the tidal energy industry NERC £1,768,730 Jan. 1, 2018 Dec. 31, 2021 Closed 35 EPICTidal: Establishing the performance implications of employing lower cost methods for the manufacture of large scale tidal turbine rotors Innovate UK £139,902 March 31, 2017 March 30, 2018 Closed 36 Spectral Leading Edge Serrations for the Reduction of Aerofoil-Turbulence Interaction Noise EPSRC £895,406 June 28, 2012 June 29, 2015 Closed 37 Spectral Leading Edge Serrations for the Reduction of Aerofoil-Turbulence Interaction Noise EPSRC £2,238,515 June 28, 2012 June 30, 2015 Closed 38 Realistic and validated test environments for wave-windcurrent systems EPSRC £0 Aug. 31, 2020 Aug. 31, 2024 Active 39 ALL-TTidal: Arrays of Long Life Turbines for Tidal EPSRC £245,256 Sept. 30, 2014 June 29, 2015 Closed 40 Measuring ADD Noise in TIdal Streams (MANTIS): Could Acoustic Deterrent Devices (ADDs) reduce risk of marine mammal collisions with tidal turbines? NERC £663,258 Jan. 1, 2018 April 29, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »