More like:
Wind Tunnel [Clear]

# Title Funder Funding Start End Status
1 VAWT Innovate UK
£10,000
April 30, 2014 Oct. 31, 2014 Closed
2 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£2,580,280
June 30, 2021 June 29, 2026 Active
3 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£6,450,700
June 30, 2021 June 30, 2026 Active
4 CUTLAS - Continuous Wind Turbine Life Assessment Software Innovate UK
£46,543
Nov. 1, 2022 April 29, 2023 Active
5 Development of an advanced Vertical Axis Wind Turbine prototype capable of grid parity by X-Wind Power Limited Innovate UK
£130,906
April 30, 2012 June 29, 2013 Closed
6 Development of an advanced Vertical Axis Wind Turbine prototype capable of grid parity by X-Wind Power Limited Innovate UK
£327,265
April 30, 2012 June 30, 2013 Closed
7 Advanced study of the atmospheric flow Integrating REal climate conditions to enhance wind farm and wind turbine power production and increase components durability Horizon Europe Guarantee
£2,475,295
Jan. 1, 2023 Dec. 31, 2026 Active
8 Advanced Motion systems For Intersecting Beam Implementation of Anemometric LIDAR Innovate UK
£361,968
March 1, 2017 Feb. 28, 2018 Closed
9 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK
£609,893
May 31, 2021 March 30, 2023 Active
10 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK
£914,838
May 31, 2021 March 31, 2023 Closed
11 Project FAIRCOP - Feasibility of Converging Beam LIDAR for Improving Crane Operational Productivity Innovate UK
£78,442
March 1, 2019 Feb. 29, 2020 Closed
12 Project FAIRCOP - Feasibility of Converging Beam LIDAR for Improving Crane Operational Productivity ISCF
£196,105
March 1, 2019 Feb. 29, 2020 Closed
13 Reliability analysis, diagnosis and prognosis of direct drive and medium speed generators EPSRC
£538,768
March 1, 2021 Feb. 28, 2023 Active
14 Reliability analysis, diagnosis and prognosis of direct drive and medium speed generators EPSRC
£1,346,920
March 1, 2021 Feb. 29, 2024 Active
15 SWEPT2 EPSRC
£179,650
April 30, 2015 April 29, 2018 Closed
16 SWEPT2 EPSRC
£449,125
April 30, 2015 April 30, 2018 Closed
17 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£2,953,388
Nov. 2, 2015 April 30, 2019 Closed
18 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£7,383,470
Nov. 2, 2015 May 1, 2019 Closed
19 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC
£4,568,070
June 30, 2023 Feb. 28, 2027 Active
20 Condition Monitoring OffshoreWind Turbine throughMachine Learning EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
Reset