Home Projects More like: New Power Device Architectures in Silicon [Clear] # Title Funder Funding Start End Status 81 Ultra high detectivity single carrier multiplication InAs avalanche photodiodes for IR optical detection EPSRC £763,178 Nov. 1, 2010 April 29, 2014 Closed 82 Ultra high detectivity single carrier multiplication InAs avalanche photodiodes for IR optical detection EPSRC £489,026 Sept. 30, 2010 March 30, 2014 Closed 83 Ultra high detectivity single carrier multiplication InAs avalanche photodiodes for IR optical detection EPSRC £1,907,945 Nov. 1, 2010 April 30, 2014 Closed 84 Standardisation of a Thermal Memory System - STORM Innovate UK £220,668 Nov. 1, 2019 Jan. 31, 2021 Closed 85 EPSRC Project Summary: New Methods for Network Time Series Analysis EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 86 Increasing resource efficiency in the silicon carbide power market Innovate UK £50,000 March 31, 2022 March 30, 2023 Active 87 Software Engineering - In Support of the Exascale EPSRC £1,424,366 March 31, 2016 March 30, 2021 Closed 88 Light and Elevated Temperature Induced Degradation of Silicon Solar Cells EPSRC £1,252,936 April 28, 2020 April 27, 2023 Active 89 Showering Smartly. The impact of real-time feedback to nudge shower users to save water, energy and carbon emissions. ESRC £216,576 Sept. 30, 2021 March 30, 2023 Active 90 Providing insights into multi-day traveller behaviour to inform sustainable transport policies and practices ESRC £160,858 Sept. 30, 2018 Sept. 29, 2019 Closed 91 Constraining projections of ice sheet instabilities and future sea level rise FLF £6,253,685 April 30, 2019 April 30, 2024 Active 92 TESiC-SuperJ - Trench Epitaxy for SiC Superjunctions: technology enabling low loss HVDC power electronics. EPSRC £797,602 Sept. 30, 2021 Sept. 29, 2024 Active 93 TESiC-SuperJ - Trench Epitaxy for SiC Superjunctions: technology enabling low loss HVDC power electronics. EPSRC £1,994,005 Sept. 30, 2021 Sept. 30, 2024 Active 94 A Climate Compatible Industrial Strategy NERC £705,602 Jan. 1, 2018 Sept. 29, 2018 Closed 95 A Climate Compatible Industrial Strategy NERC £552,196 Sept. 30, 2018 May 7, 2022 Active 96 A Climate Compatible Industrial Strategy NERC £1,764,005 Jan. 1, 2018 Sept. 30, 2018 Closed 97 A Climate Compatible Industrial Strategy NERC £1,380,490 Sept. 30, 2018 May 8, 2022 Closed 98 Energy Revolution: The Political Ecology of Energy Use in Socialist Cuba ESRC £203,906 Sept. 30, 2018 Sept. 29, 2019 Closed 99 Energy Revolution: The Political Ecology of Energy Use in Socialist Cuba ESRC £509,765 Sept. 30, 2018 Sept. 30, 2019 Closed 100 EPSRC Engineering Fellowships for Growth: Narrow Band-gap Semiconductors for Integrated Sensing and Communications EPSRC £2,031,258 Aug. 30, 2014 Feb. 28, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »