# Title Funder Funding Start End Status
21 Wireless sensor design for wind turbine preventative maintenance Innovate UK
£120,750
July 31, 2012 Oct. 31, 2012 Closed
22 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK
£370,240
Feb. 1, 2019 July 30, 2020 Closed
23 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK
£925,600
Feb. 1, 2019 July 31, 2020 Closed
24 Developing and validating a holistic O&M optimisation tool for offshore renewable energy projects EPSRC
£0
Aug. 31, 2019 Aug. 30, 2023 Active
25 Developing and validating a holistic O&M optimisation tool for offshore renewable energy projects EPSRC
£0
Aug. 31, 2019 Oct. 31, 2023 Active
26 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK
£200,000
Jan. 1, 2012 Dec. 31, 2012 Closed
27 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK, NERC
£500,000
Jan. 1, 2012 Dec. 31, 2012 Closed
28 Advanced Infrastructure Modelling System (AIMS) Innovate UK
£191,322
March 1, 2017 Feb. 28, 2018 Closed
29 Probabilistic assessment of structural integrity of composite components in offshore wind energy EPSRC
£0
Aug. 31, 2021 Aug. 31, 2025 Active
30 Data-driven Optimisation of Offshore Wind Operations & Maintenance EPSRC
£0
Aug. 31, 2021 Aug. 31, 2025 Active
31 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£2,580,280
June 30, 2021 June 29, 2026 Active
32 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£6,450,700
June 30, 2021 June 30, 2026 Active
33 Evaluating Novel Wind Energy Designs EPSRC
£0
Sept. 23, 2018 March 30, 2022 Active
34 Evaluating Novel Wind Energy Designs EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
35 Subsea power cable geotechnical stability for offshore wind applications EPSRC
£0
Sept. 30, 2019 Jan. 4, 2024 Active
36 Subsea power cable geotechnical stability for offshore wind applications EPSRC
£0
Sept. 30, 2019 Jan. 4, 2024 Active
37 Investigation of the causes for wind turbine underperformance and increased failure rates EPSRC, NERC
£0
Sept. 30, 2018 Nov. 30, 2022 Closed
38 API Engineering technical feasibility study for a direct drive small wind turbine with an integrated induction generator & power converter for a 'plug and play' approach Innovate UK
£200,000
Sept. 30, 2011 March 31, 2013 Closed
39 Reducing the ‘levelised cost of energy’ in offshore wind through a disruptive fault diagnosis technology, SmartCMS Innovate UK
£607,112
Nov. 1, 2020 Jan. 31, 2022 Closed
40 Reducing the ‘levelised cost of energy’ in offshore wind through a disruptive fault diagnosis technology, SmartCMS Innovate UK
£1,517,780
Nov. 1, 2020 Jan. 31, 2022 Closed
Reset