Home Projects More like: Cryogenic-temperature Cold Storage using Micro-encapsulated Phase Change Materials in Slurries [Clear] # Title Funder Funding Start End Status 21 Salt-cooled High-temperature Reactors EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 22 AGR Technologies for Enabling Molten Salt-cooled Reactor Designs EPSRC £1,640,640 Aug. 31, 2018 Nov. 30, 2021 Closed 23 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £2,677,438 July 10, 2013 April 27, 2017 Closed 24 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £6,693,595 July 10, 2013 April 28, 2017 Closed 25 Advanced hybrid thermochemical-compression seasonal solar energy storage and heat pump system (Solar S&HP) EPSRC £2,027,932 Sept. 30, 2020 March 31, 2024 Active 26 Advanced hybrid thermochemical-compression seasonal solar energy storage and heat pump system (Solar S&HP) EPSRC £5,069,830 Sept. 30, 2020 Sept. 30, 2024 Active 27 A versatile PCM energy storage system for building applications (Versatile PCM) EPSRC £1,659,852 Sept. 30, 2020 Sept. 29, 2023 Active 28 A versatile PCM energy storage system for building applications (Versatile PCM) EPSRC £4,149,630 Sept. 30, 2020 March 31, 2024 Active 29 MaxImiSing flexibility through multi-Scale IntegratiON of energy systems (MISSION) EPSRC £1,257,744 June 28, 2018 May 30, 2022 Closed 30 nano-Structured PCM Composites for Compact Space Heating: n-CoSH EPSRC £1,849,182 Nov. 1, 2016 March 30, 2021 Closed 31 nano-Structured PCM Composites for Compact Space Heating: n-CoSH EPSRC £4,622,955 Nov. 1, 2016 March 31, 2021 Closed 32 Industrial Demand Reduction through Innovative Storage Technologies (IDRIST) EPSRC £3,056,685 Dec. 1, 2014 May 31, 2017 Closed 33 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £199,806 Feb. 12, 2020 Aug. 10, 2021 Closed 34 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £499,515 Feb. 12, 2020 Aug. 11, 2021 Closed 35 Newton Fund: An ORC power plant integrated with thermal energy storage to utilise renewable heat sources for distributed H&P EPSRC £791,564 April 30, 2017 April 29, 2019 Closed 36 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £2,594,834 Sept. 30, 2020 Sept. 29, 2024 Active 37 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £6,487,085 Sept. 30, 2020 Sept. 30, 2024 Active 38 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC £403,472 July 2, 2017 July 1, 2018 Closed 39 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC £1,008,680 July 2, 2017 July 2, 2018 Closed 40 The University of Birmingham - Equipment Account EPSRC £13,454,774 Dec. 19, 2013 Oct. 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »