1 Subsea power cable geotechnical stability for offshore wind applications EPSRC
£0
Sept. 30, 2019 Jan. 4, 2024 Active
2 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC
£2,449,800
March 1, 2022 May 30, 2025 Active
3 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC
£6,124,500
May 31, 2022 May 31, 2025 Active
4 Offshore Cable Burial: How deep is deep enough? EPSRC
£781,144
Feb. 14, 2022 Aug. 12, 2025 Active
5 Offshore Cable Burial: How deep is deep enough? EPSRC
£578,838
Sept. 30, 2021 Aug. 30, 2025 Active
6 Offshore Cable Burial: How deep is deep enough? EPSRC
£928,624
Sept. 30, 2021 Sept. 29, 2025 Active
7 Offshore Cable Burial: How deep is deep enough? EPSRC
£2,321,560
March 31, 2022 Sept. 30, 2025 Active
8 Submarine mass movements and their interaction with critical offshore infrastructure EPSRC
£659,508
Dec. 1, 2023 May 31, 2025 Active
9 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
10 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
11 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
12 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
13 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC
£4,568,070
June 30, 2023 Feb. 28, 2027 Active
14 Energy Transfer for Offshore Wind Energy EPSRC
£0
Sept. 30, 2022 Sept. 29, 2025 Active
15 Energy Transfer for Offshore Wind Energy EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
16 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC
£0
Aug. 31, 2020 Feb. 29, 2024 Active
17 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC
£0
Aug. 31, 2020 Feb. 29, 2024 Active
18 Design of Foundations and Anchors in Rock for Offshore Wind Energy Systems EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
19 Design of Foundations and Anchors in Rock for Offshore Wind Energy Systems EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
20 Optical Fibre Sensing for Offshore Renewable Energy EPSRC
£0
Aug. 31, 2019 Aug. 30, 2023 Closed