Home Projects More like: Erosion Sensors for continuous monitoring of coatings (EROSCANS) [Clear] # Title Funder Funding Start End Status 41 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £7,287,715 Jan. 1, 2019 Dec. 31, 2020 Closed 42 Coating Substitution for Reduced Environmental Impact (SUSCOAT) EPSRC £758,290 Jan. 1, 2010 Dec. 31, 2013 Closed 43 ENHANCING AEROMECHANICAL ANALYSIS AND DESIGN CAPABILITIES OF WIND TURBINE ROTORS BY MEANS OF NONLINEAR FREQUENCY-DOMAIN COMPUTATIONAL FLUID DYNAMICS EPSRC £604,084 Sept. 15, 2008 Sept. 14, 2011 Closed 44 ENHANCING AEROMECHANICAL ANALYSIS AND DESIGN CAPABILITIES OF WIND TURBINE ROTORS BY MEANS OF NONLINEAR FREQUENCY-DOMAIN COMPUTATIONAL FLUID DYNAMICS EPSRC £1,510,210 Sept. 15, 2008 Sept. 15, 2011 Closed 45 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £652,520 Jan. 5, 2009 July 3, 2012 Closed 46 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £1,631,300 Jan. 5, 2009 July 4, 2012 Closed 47 Strategies for reducing cost of Engineering Optimisation EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 48 Strategies for reducing cost of Engineering Optimisation EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 49 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 50 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 51 An experimental and theoretical investigation into ice ribbing instabilities EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 52 Blade Integrated Optics For Offshore Wind LIDAR (BIOFOWL) Innovate UK £455,094 March 1, 2017 Feb. 28, 2018 Closed 53 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 54 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC, NERC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 55 Nanomechanical Testing in Controlled Environments and in the TEM (Nano-TCT) EPSRC £1,822,714 Jan. 1, 2019 June 29, 2021 Closed 56 R&D to develop spray application using a bespoke drone to improve the operating efficacy of wind turbine technology Innovate UK £699,500 Feb. 1, 2022 July 30, 2023 Active 57 Fluid-structure coupling for the stability and energy performance of a wind turbine with hyper- flexible blades, under different hydrodynamic flow reg EPSRC £0 Oct. 17, 2021 Oct. 17, 2024 Active 58 Multiscale Modelling of the Erosive Impact of Particles EPSRC £0 July 31, 2019 July 30, 2022 Active 59 Breakdown of helical vortices in wind farms EPSRC £196,818 Aug. 31, 2015 Sept. 10, 2016 Closed 60 Breakdown of helical vortices in wind farms EPSRC £69,672 Nov. 1, 2016 May 1, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »