Home Projects More like: Effects of turbulent flow conditions on performance of wind and tidal turbines [Clear] # Title Funder Funding Start End Status 81 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC £4,506,885 Feb. 1, 2012 July 31, 2015 Closed 82 Streak Instability and Bypass Transition EPSRC £706,514 Dec. 15, 2008 June 13, 2012 Closed 83 Monitoring and forecasting avian collision risk at an operational offshore wind farm NERC £255,264 Jan. 1, 2018 March 30, 2020 Closed 84 Monitoring and forecasting avian collision risk at an operational offshore wind farm NERC £638,160 Jan. 1, 2018 March 31, 2020 Closed 85 Sediment transport processes in vegetated canopies under full-scale wave conditions EPSRC £0 Aug. 31, 2017 Aug. 31, 2020 Closed 86 Measured dynamic loading and power performance of tidal turbines in realistic flow conditions EPSRC £371,400 Sept. 30, 2014 Sept. 29, 2015 Closed 87 Adaptively Tuned High-Order Unstructured Finite-Volume Methods for Turbulent Flows EPSRC £102,688 Aug. 31, 2022 Aug. 30, 2023 Active 88 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £735,060 Jan. 1, 2020 Dec. 31, 2023 Active 89 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £1,837,650 Jan. 1, 2020 Dec. 31, 2023 Active 90 H2: Absolute zero-carbon propulsion systems EPSRC £860,306 March 1, 2022 Feb. 28, 2025 Active 91 H2: Absolute zero-carbon propulsion systems EPSRC £2,150,765 Aug. 31, 2022 Feb. 28, 2025 Active 92 Machine learning informed tidal array optimisation EPSRC £0 Sept. 30, 2022 March 1, 2026 Active 93 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 94 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 95 Venus Express science exploitation STFC £508,192 Nov. 1, 2008 Oct. 31, 2011 Closed 96 Venus Express science exploitation STFC £1,270,480 Nov. 1, 2008 Oct. 31, 2011 Closed 97 Combustor thermoacoustics for multi-burner low emissions gas turbines (CHAMBER) EPSRC £1,514,258 Jan. 1, 2017 Dec. 31, 2020 Closed 98 IMT Physics-based and Data-driven Modelling of pollutant Emissions from Engines EPSRC £0 June 30, 2021 Dec. 31, 2024 Active 99 Enabling Sustainable Wind Energy Expansion in Seasonally Stratified Seas (eSWEETS3) NERC £34,545 April 30, 2024 Feb. 28, 2027 Active 100 Enabling Sustainable Wind Energy Expansion in Seasonally Stratified Seas (eSWEETS3) NERC £2,517,365 April 30, 2024 Feb. 28, 2027 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »