History of changes to: XL-Connect Large scale system approach for advanced charging solutions
Date Action Change(s) User
Feb. 13, 2024, 4:19 p.m. Created 43 [{"model": "core.projectfund", "pk": 60924, "fields": {"project": 9091, "organisation": 11086, "amount": 104332, "start_date": "2023-01-01", "end_date": "2026-06-30", "raw_data": 179220}}]
Jan. 30, 2024, 4:24 p.m. Created 43 [{"model": "core.projectfund", "pk": 53776, "fields": {"project": 9091, "organisation": 11086, "amount": 104332, "start_date": "2023-01-01", "end_date": "2026-06-30", "raw_data": 155893}}]
Jan. 2, 2024, 4:15 p.m. Created 43 [{"model": "core.projectfund", "pk": 46572, "fields": {"project": 9091, "organisation": 11086, "amount": 104332, "start_date": "2023-01-01", "end_date": "2026-06-30", "raw_data": 134211}}]
Dec. 5, 2023, 4:23 p.m. Created 43 [{"model": "core.projectfund", "pk": 39323, "fields": {"project": 9091, "organisation": 11086, "amount": 104332, "start_date": "2023-01-01", "end_date": "2026-06-29", "raw_data": 101875}}]
Nov. 27, 2023, 2:11 p.m. Added 35 {"external_links": []}
Nov. 21, 2023, 4:35 p.m. Created 43 [{"model": "core.projectfund", "pk": 31997, "fields": {"project": 9091, "organisation": 11086, "amount": 104332, "start_date": "2023-01-01", "end_date": "2026-06-29", "raw_data": 61070}}]
Nov. 21, 2023, 4:35 p.m. Created 41 [{"model": "core.projectorganisation", "pk": 90621, "fields": {"project": 9091, "organisation": 12405, "role": "PARTICIPANT_ORG"}}]
Nov. 21, 2023, 4:35 p.m. Created 41 [{"model": "core.projectorganisation", "pk": 90620, "fields": {"project": 9091, "organisation": 12405, "role": "LEAD_ORG"}}]
Nov. 21, 2023, 4:35 p.m. Created 40 [{"model": "core.projectperson", "pk": 56912, "fields": {"project": 9091, "person": 16284, "role": "PM_PER"}}]
Nov. 20, 2023, 2:02 p.m. Updated 35 {"title": ["", "XL-Connect Large scale system approach for advanced charging solutions"], "description": ["", "\nThe number of battery-powered electric vehicles is expected to be at 30-40 million by 2030 in the EU. This strong increase of electric\nvehiclesis a big challenge for the energy system in Europe, but at the same time a chance to use V1G/V2G/V2X-technologies. As vehicles\nare mainly parking, they can be used as energy storage in order to increase grid stability. The overall project objective is to optimize\nthe entire charging chain - from energy provision to the end user - to create a clear benefit for all stakeholders. Therefore, a ubiquitous\non-demand charging solution based on an optimized charging network considering human, technical and economic factors along the\nentire charging chain shall be developed. The investigation of the user behavior as well as the analysis of the energy system and grid will\nform the basis from a research side, to predict the future behavior of EV owners and fleet operators as well as possible shortcomings in\nthe electric grid and energy system. The development of advanced charging technologies and control mechanisms as well as advanced\ncharging and sector coupling concepts, will form the basis for the virtual and real evalulations/demonstrations conducted in 4 different\nEuropean countries(Belgium, Germany, Italy, Portugal). In parallel a smart charging simulation environment (digital twin of the charging\nchain with a holistic simulation environment with multilevel component models and representative information flow between all agents)\nwill be built up. This digital twin will incorporate the results of the demonstration actions and enable an upscaling to show the impact of\nthese technologies. To ensure the interoperability and the optimization along this charging chain, the consortium comprises all relevant\npartners/stakeholders (energy providers, grid operators, charge point operator, EV equipment providers as well a vehicle manufacturer)\nThis project has received funding from the European Union\u2019s Horizon 2020 Research and Innovation Programme under Grant Agreement number 101056756.\nFunding has been granted through Innovate UK under the Horizon Europe Guarantee..\nUK participants in Horizon Europe Project: XL-Connect Large scale system approach for advanced charging solutions\nare supported by UKRI Grants Number 101056756. Ricardo UK Limited.\n\n"], "extra_text": ["", "\n\n\n\n"], "status": ["", "Active"]}
Nov. 20, 2023, 2:02 p.m. Added 35 {"external_links": [37335]}
Nov. 20, 2023, 2:02 p.m. Created 35 [{"model": "core.project", "pk": 9091, "fields": {"owner": null, "is_locked": false, "coped_id": "6f7ef0f8-f2bb-48bc-bac7-fbdf5f3a4153", "title": "", "description": "", "extra_text": "", "status": "", "start": null, "end": null, "raw_data": 61053, "created": "2023-11-20T13:09:02.980Z", "modified": "2023-11-20T13:09:02.980Z", "external_links": []}}]