Description

More Like This


All of the commercially available wind turbine blade designs from the largest wind turbine OEM's use a shell constructed from two separate halves, with one or more shear webs positioned between the two halves to form an "I-beam" structure and provide the required mechanical strength.

During the blade assembly process, the shear web(s) are transported to the blade halves using a large, product specific lifting device, known as a "Shear Web Positioner". This lifting device is used to ensure the shear webs location inside the blade is within the ±2mm positioning tolerance as the position of the webs are critical to the performance of the blade. They can cost anywhere in the range of £400,000 to £1,400,000, contain over 30 tonnes of steel and cannot be easily recycled or reused.

As offshore wind energy becomes critical to meeting the targets stipulated in the Paris Agreement, DFS have identified a market trend for increasing blade length, especially for the 15MW designs expected to be installed over the next decade. This project will explore multiple methods of future-proofing the shear web positioning process for these large offshore wind blade designs.

Subjects by relevance
  1. Wind energy
  2. Wind power stations
  3. Shearing
  4. Planning and design

Extracted key phrases
  1. Large offshore wind blade design
  2. Shear web positioning process
  3. Available wind turbine blade
  4. Large wind turbine OEM
  5. Shear webs location
  6. Blade half
  7. Blade assembly process
  8. Blade length
  9. Shear web(s
  10. Plusmn;2 mm positioning tolerance
  11. Offshore wind energy
  12. Disruptive approach
  13. Product specific lifting device
  14. Separate half
  15. Use

Related Pages

UKRI project entry

UK Project Locations