Title
iWave Systems Ltd

CoPED ID
101dd833-520f-4a1f-b6e7-153968a9f976

Status
Active

Funder

Value
£49,000

Start Date
Nov. 1, 2022

End Date
April 29, 2023

Description

More Like This


The wind renewables sector is a relatively new and rapidly growing industry which has at its heart a very up to date, clear and concise HSE culture from onshore operations all the way to the very demanding and sometimes remote offshore locations.

Every aspect on a windfarms successful operation is born from the entire site and team adhering and constantly modifying all aspects of a safe work habit and environment. Which if not present or understood would results in a windfarm underperforming and losing revenue due to lost KPIs and down time. As we all know any serious HSE incident could result in a full investigation and potential impact on revenue and targets being missed.

With this in mind the Sector is extremely clear on the rules and how they are applied and adhered to from lift operations through to correct documentation and procedures.

After careful and continuous monitoring and study it became clear to iWave that there was a fundamental grey area within the essential process of disembarkment from the site CTVs to the WTGs by technicians.

A site will have its procedures with regards to limits of transfer in marginal conditions. This maybe a set time and visual monitoring of the amount of movement the pushed on vessel moves which in turn will be interpretted by the vessel crew and technicians and a decision will hopefully be made as to whether it was safe to proceed.

This practice has a few knock on results due to the human error and difference to an individuals perceptions in safe limits. Resulting in many times a team may transfer over limits or vice versa not transfer in conditions that are actually within limits. In either case the results can vary from a turbine that is down not getting fixed or a team is transfers in dangerous conditions in which case any incident could result in liability and HSE investigations.

iWave have designed a system that will within a set time frame and set parameters on movement will deliver an easy to obey red light green light command. The systems parameters and time frames are all adjustable meaning a site can tailor its requirements and then the procedure will be signed off by all involved from shareholder (JOV) all the way down to technicians, this will eliminate any commercial pressure and set and industry standard giving absolute confidence to transferring teams.

Iwave Systems Ltd LEAD_ORG
Iwave Systems Ltd PARTICIPANT_ORG

Simon Jackson PM_PER

Subjects by relevance
  1. Culture sector
  2. Liability
  3. Success
  4. Organisations (systems)

Extracted key phrases
  1. IWave Systems Ltd
  2. Wind renewable sector
  3. Set time
  4. Windfarm successful operation
  5. Time frame
  6. Safe limit
  7. Concise HSE culture
  8. Result
  9. Red light green light command
  10. Entire site
  11. HSE investigation
  12. Site ctv
  13. HSE incident
  14. Safe work habit
  15. Onshore operation

Related Pages

UKRI project entry

UK Project Locations