Title
iWESH - Integrated Whole Energy Storage with Hydrogen

CoPED ID
a697a612-64f3-4bce-891d-5e66f0d2aca2

Status
Closed


Value
£418,244

Start Date
Nov. 1, 2015

End Date
Jan. 31, 2017

Description

More Like This


This 12 month technical feasibility project tests the opportunity for an innovative whole system approach to

solve the trilemma of improving energy security from increased deployment of renewable generation which is

otherwise grid constrained, providing an overall improvement of the commercial viability of renewable

generation, and reducing the cost of producing "green" hydrogen particularly where additional grid costs are

incurred, such as farms and remote locations. It creates a technically validated, detailed model, based on using

a novel control system, that balances energy generation and use on site that is connection compliant to the

parameters stipulated in Engineering Recommendation G83/3, enabling real time cost, grid balancing and peak

shaving capability to store and produce low cost hydrogen. The project, led by ULEMCO Ltd with partners

Revolve Technologies and Clean Power Solutions, takes the current individual system components (already

installed at Springbank Farm, Cheshire), adds SMART on board vehicle storage, low cost h2 refuelling, and then

gathers real use data to define, quantify and validate the optimum operating value of the whole system.

ULEMCO Ltd LEAD_ORG
ULEMCO Ltd PARTICIPANT_ORG
Revolve Technologies Limited PARTICIPANT_ORG
Clean Power Solutions Ltd PARTICIPANT_ORG

Subjects by relevance
  1. Costs
  2. Hydrogen
  3. Renewable energy sources
  4. Fuels
  5. Farms
  6. Data systems
  7. Safety and security
  8. Innovations
  9. Projects
  10. Energy control
  11. Warehousing
  12. Cost effectiveness

Extracted key phrases
  1. Month technical feasibility project
  2. Energy Storage
  3. IWESH
  4. Hydrogen
  5. Low cost hydrogen
  6. Additional grid cost
  7. Low cost h2 refuelling
  8. Real time cost
  9. Integrated
  10. Current individual system component
  11. System approach
  12. Novel control system
  13. Renewable generation
  14. Energy generation
  15. Real use datum