History of changes to: ReFlex
Date Action Change(s) User
Nov. 27, 2023, 2:13 p.m. Added 35 {"external_links": []}
Nov. 20, 2023, 2:03 p.m. Added 35 {"external_links": []}
Nov. 13, 2023, 1:34 p.m. Added 35 {"external_links": []}
Nov. 6, 2023, 1:31 p.m. Added 35 {"external_links": []}
Aug. 14, 2023, 1:31 p.m. Added 35 {"external_links": []}
Aug. 7, 2023, 1:32 p.m. Added 35 {"external_links": []}
July 31, 2023, 1:34 p.m. Added 35 {"external_links": []}
July 24, 2023, 1:36 p.m. Added 35 {"external_links": []}
July 17, 2023, 1:35 p.m. Added 35 {"external_links": []}
July 10, 2023, 1:26 p.m. Added 35 {"external_links": []}
July 3, 2023, 1:27 p.m. Added 35 {"external_links": []}
June 26, 2023, 1:26 p.m. Added 35 {"external_links": []}
June 19, 2023, 1:27 p.m. Added 35 {"external_links": []}
June 12, 2023, 1:29 p.m. Added 35 {"external_links": []}
June 5, 2023, 1:34 p.m. Added 35 {"external_links": []}
May 29, 2023, 1:28 p.m. Added 35 {"external_links": []}
May 22, 2023, 1:29 p.m. Added 35 {"external_links": []}
May 15, 2023, 1:32 p.m. Added 35 {"external_links": []}
May 8, 2023, 1:37 p.m. Added 35 {"external_links": []}
May 1, 2023, 1:28 p.m. Added 35 {"external_links": []}
April 24, 2023, 1:35 p.m. Added 35 {"external_links": []}
April 17, 2023, 1:28 p.m. Added 35 {"external_links": []}
April 10, 2023, 1:25 p.m. Added 35 {"external_links": []}
April 3, 2023, 1:26 p.m. Added 35 {"external_links": []}
Jan. 28, 2023, 11:09 a.m. Created 43 [{"model": "core.projectfund", "pk": 29880, "fields": {"project": 7100, "organisation": 4, "amount": 6693502, "start_date": "2019-03-31", "end_date": "2023-03-30", "raw_data": 49448}}]
Jan. 28, 2023, 11:09 a.m. Created 40 [{"model": "core.projectperson", "pk": 54564, "fields": {"project": 7100, "person": 11243, "role": "PM_PER"}}]
Jan. 28, 2023, 10:52 a.m. Updated 35 {"description": ["\n"The energy system in Orkney is subject to specific constraints, and its independent location means it is the ideal location to demonstrate the capabilities of a self-contained smart energy network, and the potential impact it can deliver.\n\nOrkney is a representation of energy supply problems which energy networks find difficult to solve using traditional technology. Specifically; Orkney produces 130% of the electricity it needs through existing installed renewable generation, yet 63% of Orkneys residents live in fuel poverty.\n\nProject **ReFLEX** will install **FLEX**ible technologies to address the restrictions which cause this imbalance and demonstrate a **Re**sponsive Virtual Energy System which links these networks together. Thus, allowing production to be maximised, efficiencies to be recovered, and new business models to be proven, meaning energy can be supplied at minimum cost to the consumer and generating knowledge which will allow us to replicate activity and impact across the UK and internationally.\n\nThe project will last for 36 months and include the installation and operation of multiple technologies including:\n\n\\*Hydrogen Fuel Cell for the provision of electricity and heat\n\n\\*Domestic energy storage\n\n\\*Commercial energy storage\n\n\\*Vehicle to grid charging infrastructure\n\n\\*Ground source heat pump systems\n\n\\*Building management systems\n\n\\*Virtual power plant systems\n\n\\*Integrated Grid-smart community-led transport system and infrastructure\n\nA Virtual Energy System will combine the above infrastructure alongside existing infrastructure on Orkney to demonstrate the capabilities of a smart energy system; linking together the electricity, heat and transport energy networks to create a system of maximum efficiency and value for consumers, generators, suppliers and operators within the energy system."\n\n", "\n"The energy system in Orkney is subject to specific constraints, and its independent location means it is the ideal location to demonstrate the capabilities of a self-contained smart energy network, and the potential impact it can deliver.\n\nOrkney is a representation of energy supply problems which energy networks find difficult to solve using traditional technology. Specifically; Orkney produces 130% of the electricity it needs through existing installed renewable generation, yet 63% of Orkneys residents live in fuel poverty.\n\nProject **ReFLEX** will install **FLEX**ible technologies to address the restrictions which cause this imbalance and demonstrate a **Re**sponsive Virtual Energy System which links these networks together. Thus, allowing production to be maximised, efficiencies to be recovered, and new business models to be proven, meaning energy can be supplied at minimum cost to the consumer and generating knowledge which will allow us to replicate activity and impact across the UK and internationally.\n\nThe project will last for 36 months and include the installation and operation of multiple technologies including:\n\n\\*Vehicle to grid charging infrastructure\n\n\\*Building management systems\n\n\\*Virtual power plant systems\n\n\\*Integrated Grid-smart community-led transport system and infrastructure\n\n\\*Smart Heating Controllers\n\nA Virtual Energy System will combine the above infrastructure to demonstrate the capabilities of a smart energy system.\n\n"]}
Jan. 28, 2023, 10:52 a.m. Added 35 {"external_links": []}
April 11, 2022, 3:48 a.m. Created 43 [{"model": "core.projectfund", "pk": 22015, "fields": {"project": 7100, "organisation": 4, "amount": 15046326, "start_date": "2019-03-31", "end_date": "2023-03-30", "raw_data": 32727}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83063, "fields": {"project": 7100, "organisation": 905, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83062, "fields": {"project": 7100, "organisation": 964, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83061, "fields": {"project": 7100, "organisation": 2412, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83060, "fields": {"project": 7100, "organisation": 8772, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83059, "fields": {"project": 7100, "organisation": 188, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83058, "fields": {"project": 7100, "organisation": 7268, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83057, "fields": {"project": 7100, "organisation": 6878, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:48 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 83056, "fields": {"project": 7100, "organisation": 964, "role": "LEAD_ORG"}}]
April 11, 2022, 3:48 a.m. Created 40 [{"model": "core.projectperson", "pk": 51468, "fields": {"project": 7100, "person": 9899, "role": "PM_PER"}}]
April 11, 2022, 1:48 a.m. Updated 35 {"title": ["", "ReFlex"], "description": ["", "\n"The energy system in Orkney is subject to specific constraints, and its independent location means it is the ideal location to demonstrate the capabilities of a self-contained smart energy network, and the potential impact it can deliver.\n\nOrkney is a representation of energy supply problems which energy networks find difficult to solve using traditional technology. Specifically; Orkney produces 130% of the electricity it needs through existing installed renewable generation, yet 63% of Orkneys residents live in fuel poverty.\n\nProject **ReFLEX** will install **FLEX**ible technologies to address the restrictions which cause this imbalance and demonstrate a **Re**sponsive Virtual Energy System which links these networks together. Thus, allowing production to be maximised, efficiencies to be recovered, and new business models to be proven, meaning energy can be supplied at minimum cost to the consumer and generating knowledge which will allow us to replicate activity and impact across the UK and internationally.\n\nThe project will last for 36 months and include the installation and operation of multiple technologies including:\n\n\\*Hydrogen Fuel Cell for the provision of electricity and heat\n\n\\*Domestic energy storage\n\n\\*Commercial energy storage\n\n\\*Vehicle to grid charging infrastructure\n\n\\*Ground source heat pump systems\n\n\\*Building management systems\n\n\\*Virtual power plant systems\n\n\\*Integrated Grid-smart community-led transport system and infrastructure\n\nA Virtual Energy System will combine the above infrastructure alongside existing infrastructure on Orkney to demonstrate the capabilities of a smart energy system; linking together the electricity, heat and transport energy networks to create a system of maximum efficiency and value for consumers, generators, suppliers and operators within the energy system."\n\n"], "extra_text": ["", "\n\n\n\n"], "status": ["", "Active"]}
April 11, 2022, 1:48 a.m. Added 35 {"external_links": [25757]}
April 11, 2022, 1:48 a.m. Created 35 [{"model": "core.project", "pk": 7100, "fields": {"owner": null, "is_locked": false, "coped_id": "4a6b9030-a1bc-48e1-9909-ed549038abd6", "title": "", "description": "", "extra_text": "", "status": "", "start": null, "end": null, "raw_data": 32711, "created": "2022-04-11T01:44:43.154Z", "modified": "2022-04-11T01:44:43.154Z", "external_links": []}}]