MARLIN Modular Floating Platform for Offshore Wind : Concept Assessment

Find Similar History 35 Claim Ownership Request Data Change Add Favourite

Title
MARLIN Modular Floating Platform for Offshore Wind : Concept Assessment

CoPED ID
5e8ee774-bbcb-44c4-b593-ea187925783b

Status
Closed

Funders

Value
£161,278

Start Date
Feb. 1, 2017

End Date
Oct. 31, 2017

Description

More Like This


Project MARLIN will assess and develop a new concept for a modular floating platform system for offshore wind. The
project will confirm technical and commercial feasibility of the novel method of construction and deployment of floating
structures capable of supporting commercially relevant size wind turbines from ISO standard freight container-sized
modules. Current demonstrator concepts in floating offshore wind require infrastructure of the scale unavailable or
inaccessible in most of the world. Cost reductions needed to remove barriers to floating offshore adoption will come from
development of methods not requiring large infrastructure and use of cost-effective mass manufacturing methods for
making the construction modules.
The proposed modular approach, with specially designed smaller and lighter building modules that could be towed out to
sea for assembly, is significantly technically different from the current concepts and demonstrators. The concept will
resolve the issue of prohibitively high cost of construction, logistics, and deployment in floating offshore wind.
The main overarching research objective is to design the modules and the full structure, test those out as mathematical and
physical models, carry out wave tank and sea conditions testing, and development of the manufacturing method. The
project will deliver: design of a low-cost single module building block structure, design of a full modular configurable
structure, creating physical and mathematical models, tank tests and sea test of physical models, analysis of manufacturing
feasibility including a materials selection study and identification of coastal sites and new markets for adoption of the
technology.
Two of the University of Strathclyde engineering departments, AFRC and NAOME, will work together with the other
members of the consortium.
NAOME's role within the consortium is to develop a detailed hydrodynamic simulation model of the semi-submersible
concept for two different types of floating modules - a passive one and a dynamic one which can have its buoyancy and
orientation altered. Scaled models of the two module concepts under a range of different sea states representative of
where the wind turbines will be deployed will be conducted. The results will be measured and analysed and a report
provided to the lead partner on the findings from both tests and simulations.
AFRC's role is to develop a finite element (FE) model for the initial and refined modules, to determine their suitability in
terms of structural strength performance under different load cases. Once the best configuration for the module has been
determined, the AFRC will develop a FE model for two different configurations of the final structural assembly made with
the selected module and simulate the performance of the overall structures. A report will be provided, summarising the
findings. Due to the complexity of the project, the geographical spread of the partners and the close collaborative nature of
the project, AFRC will also support Frontier Technical in the management of the project.


More Information

Potential Impact:
The project partners, Frontier Technical, the Port of Sunderland and Tarmac will receive the largest impacts from the
project. The outputs from the project will enable the partners to assess the viability of a new floating platform concept for
wind turbines which could reach a full annual production rate in 2025 of 27,000 modules equivalent to 271 5MW floating
platforms representing 1.35GW per annum installed capacity capability with a market penetration of 15%. With a profit
margin of 25% this would result in £250M profit per annum.
Global perspective
It is acknowledged and reflected in the UN/ BEIS policies, that the dependence on fossil fuels for power generation in this
country and indeed countries worldwide is unsustainable. More must be done to enable power from renewable energy
sources to take the place of fossil fuels in our energy mix. This is a challenge for developed countries such as the UK, even
with the latter benefiting from a subsidised renewables market. The deployment cost of any renewable energy solution
must be brought down to make it a feasible deployment option in the developing world. If these deployment costs can be
reduced, there is the potential for a step change in the developing markets. This project is aiming simultaneously to
contribute to solutions for all of the issues of the Energy Trilemma and the reduction in deployment costs of renewable
energy assets to meet the energy generation needs of developing countries, thereby contributing to the sustainable
development both in the UK and in the developing world.
Economic
The project is expected to have a significant economic impact in the following areas: inside the consortium: 1) form a basis
for Frontier Technical's economic activity with a prospect of becoming a significant revenue generator and employer; 2) for
the industrial partner(s): diversification into the marine structure business and further growth of business for those
companies in this sector; 3) engagement of suppliers in the supply chain and outside the consortium: 1) contributing to the
regional economy growth in North East; 3) in the developing countries market the technology could transform the economic
fortunes of the coastal areas.
Social
The social impacts of this project in the UK lie mainly within the international and national commitments to reducing
greenhouse gas emissions to limit the impact of climate change, and thereby safeguard society from its impacts. This work
could directly contribute to DBEIS policy on climate change mitigation and industrial strategy and Defra policy on climate
change adaptation. For developing countries, access to clean, affordable and reliable energy underpins all other policy
development to reduce social deprivation and improve the standard of living (ref: DFID 'Transforming Energy Access'
initiative). Currently this energy access is severely limited by the cost of deployment and infrastructure requirements that
are often either unavailable or prohibitive to develop. Unlocking this market could have underpin significant social
improvement in countries that need it most. It is anticipated also that social benefits will come though the impact on
regional employment and prosperity of the local economy in North East as the company grows. Staff and knowledge
retention within the region will help regeneration.
Environmental
As with social impacts, the environmental impacts of this project at a policy level lie within the international and national
commitments to reducing greenhouse gas emissions to limit the impact of climate change. At a project specific level, the
project will reduce the manufacturing carbon footprint of traditional fixed floating wind construction and look to use green
technologies wherever possible. The proposed technology is highly amenable to recycling and re-use and /or alternative
use of the modular units. Longer term benefits could also include green energy for aquaculture.

Paul Blackwell PI_PER
A. H. Day COI_PER
David Clelland COI_PER
Ekaterina McKenna RESEARCH_PER

Subjects by relevance
  1. Renewable energy sources
  2. Projects
  3. Energy policy
  4. Sustainable development
  5. Climate policy
  6. Development (active)
  7. Developing countries

Extracted key phrases
  1. MARLIN Modular
  2. Project MARLIN
  3. Cost single module building block structure
  4. Concept Assessment
  5. Offshore Wind
  6. Module concept
  7. New concept
  8. Project partner
  9. Relevant size wind turbine
  10. Current demonstrator concept
  11. Construction module
  12. Platform concept
  13. Project specific level
  14. Deployment cost
  15. Wind construction

Related Pages

UKRI project entry