Enhanced Management and Performance for a Sustainable UK Energy Infrastructure

Find Similar History 60 Claim Ownership Request Data Change Add Favourite

Title
Enhanced Management and Performance for a Sustainable UK Energy Infrastructure

CoPED ID
75c50a53-c478-4e9b-9019-3ae3520e86ea

Status
Closed

Funders

Value
£4,969,882

Start Date
Feb. 1, 2006

End Date
Oct. 30, 2010

Description

More Like This


Electricity transmission and distribution companies in the UK face serious challenges in continuing to provide high reliability from ageing networks. This is made more difficult by increasing economic and environmental pressures. The problems will become worse as the operating conditions of the networks are changed, to allow for the production of more electricity from renewable sources.To meet this challenge, network owners and operators need better knowledge of plant ageing and improved techniques to monitor its condition.As power is generated in different locations, so the pattern of current flow through the network changes. This alters the temperature of plant items (like transformers, overhead lines and underground cables), which make up the network. Other changes in operating conditions, such as when switches are operated, will affect the stresses seen by plant. We will investigate the effect of the new operating demands on individual items of plant in order to predict their effect on the reliability of the network.We will also investigate some innovative techniques for monitoring plant condition. These will range from techniques which give a general indication of the health of an entire substation, down to those which give detailed information on a specific item of plant. The work will look at new sensors, data capture, data management and data interpretation. Network owners and operators also need improved methods of protecting and controlling the network. New software tools will help them plan replacements as parts of the network wear out. Our work will help get the most power through the ageing network and allow owners to invest in new or replacement plant in a cost-effective way. All this has to be done while maintaining or improving the security of supply and taking into account interactions between gas and electricity networks. Software tools will be developed to calculate the optimum size and location of new generating plant and to calculate the cost that should be charged to transport electricity from a particular location.Finally, research into electrical plant with reduced environmental impact will allow the use of environmentally friendly replacements. There are three main aspects to this work: exploring methods of reducing the use of SF6 (a greenhouse gas), examining techniques for transmitting more power down existing lines and investigating methods of reducing environmental impacts (for example, oil leaks) from underground cable.EPSRC has assembled a team of six universities, which have the skills needed to tackle these challenges. These universities have worked closely with major electric utilities and equipment manufacturers to prepare this proposal. The industrial partners will provide a valuable contribution, both through funding and also by supplying their technical expertise and guidance.Our work will benefit electricity utilities, which will spend less on maintenance and get more for their money when buying new plant. Consumers will gain through improved reliability of their electricity supply. UK manufacturers will be able to exploit the new condition monitoring and diagnostic techniques. Society in general will benefit through reductions in environmental impact.

Steve Swingler PI_PER
Stephen McArthur COI_PER
George Chen COI_PER
Zhongdong Wang COI_PER
I Cotton COI_PER
Gareth Harrison COI_PER
Tim Littler COI_PER
J Spencer COI_PER
Richard Anthony Fouracre COI_PER
Simon Rowland COI_PER
Jiu Yan COI_PER
Paul Lewin COI_PER
Robin Wallace COI_PER
Brendan Fox COI_PER
Peter Crossley COI_PER
D Morrow COI_PER
Martin Judd COI_PER
Alun Vaughan COI_PER
John Goulermas COI_PER
James McDonald COI_PER
Janusz Bialek COI_PER

Subjects by relevance
  1. Power plants
  2. Distribution of electricity
  3. Electricity
  4. Electrical power networks
  5. Environmental effects
  6. Transmission of electricity
  7. Electric companies

Extracted key phrases
  1. Sustainable UK Energy Infrastructure
  2. Enhanced Management
  3. Electricity network
  4. New plant
  5. Plant condition
  6. Network change
  7. Network owner
  8. UK manufacturer
  9. New condition monitoring
  10. Plant item
  11. Replacement plant
  12. Electricity transmission
  13. Plant ageing
  14. New operating demand
  15. Electrical plant

Related Pages

UKRI project entry

UK Project Locations