Title
Warrington Energy Efficiency Project

CoPED ID
3f722e12-1292-4b14-842a-393e06cf69fa

Status
Active


Value
£500,202

Start Date
July 31, 2021

End Date
Sept. 29, 2022

Description

More Like This


This project is driven by a desire to make the plant as energy efficient as possible by upgrading and enhancing the elements that enable significant energy efficiency to be achieved. Rick Bestwick (North West) have a track record in seeking energy efficiencies and have held a Climate Change Agreement since operations commenced in Warrington in 2018, demonstrating ongoing investment in energy efficiency. In order to make the step change to leading-edge energy efficiency, funding is sought to enable the next generation of cold store technology to be applied to the existing building infrastructure. This will be a beacon to the wider food industry of the steps that will contribute to the wider UK target to achieve net zero. The project will be able to provide insight into the practical steps of retrofitting energy efficiency measures in an industry hampered by long plant asset lives. This major step change will be achieved through the introduction of the latest energy efficient technology offering a significant saving in energy usage per annum and consequent carbon emission reductions

Subjects by relevance
  1. Energy efficiency
  2. Climate changes
  3. Emissions
  4. Energy
  5. Efficiency (properties)
  6. Energy saving
  7. Energy consumption (energy technology)
  8. Construction
  9. Projects
  10. Energy policy

Extracted key phrases
  1. Warrington Energy Efficiency Project
  2. Significant energy efficiency
  3. Edge energy efficiency
  4. Energy efficiency measure
  5. Late energy efficient technology
  6. Energy usage
  7. Major step change
  8. Wide food industry
  9. Long plant asset
  10. Practical step
  11. Climate Change Agreement
  12. Project
  13. Cold store technology
  14. Wide UK target
  15. Significant saving

Related Pages

UKRI project entry

No UK locations linked to this project.