History of changes to: 66kV Collector Interface for HVDC
Date Action Change(s) User
Nov. 27, 2023, 2:12 p.m. Added 35 {"external_links": []}
Nov. 20, 2023, 2:02 p.m. Added 35 {"external_links": []}
Nov. 13, 2023, 1:33 p.m. Added 35 {"external_links": []}
Nov. 6, 2023, 1:31 p.m. Added 35 {"external_links": []}
Aug. 14, 2023, 1:30 p.m. Added 35 {"external_links": []}
Aug. 7, 2023, 1:31 p.m. Added 35 {"external_links": []}
July 31, 2023, 1:33 p.m. Added 35 {"external_links": []}
July 24, 2023, 1:35 p.m. Added 35 {"external_links": []}
July 17, 2023, 1:34 p.m. Added 35 {"external_links": []}
July 10, 2023, 1:25 p.m. Added 35 {"external_links": []}
July 3, 2023, 1:26 p.m. Added 35 {"external_links": []}
June 26, 2023, 1:25 p.m. Added 35 {"external_links": []}
June 19, 2023, 1:27 p.m. Added 35 {"external_links": []}
June 12, 2023, 1:29 p.m. Added 35 {"external_links": []}
June 5, 2023, 1:32 p.m. Added 35 {"external_links": []}
May 29, 2023, 1:27 p.m. Added 35 {"external_links": []}
May 22, 2023, 1:28 p.m. Added 35 {"external_links": []}
May 15, 2023, 1:31 p.m. Added 35 {"external_links": []}
May 8, 2023, 1:36 p.m. Added 35 {"external_links": []}
May 1, 2023, 1:27 p.m. Added 35 {"external_links": []}
April 24, 2023, 1:34 p.m. Added 35 {"external_links": []}
April 17, 2023, 1:29 p.m. Added 35 {"external_links": []}
April 10, 2023, 1:24 p.m. Added 35 {"external_links": []}
April 3, 2023, 1:26 p.m. Added 35 {"external_links": []}
Jan. 28, 2023, 11:08 a.m. Created 43 [{"model": "core.projectfund", "pk": 25183, "fields": {"project": 2370, "organisation": 4, "amount": 61885, "start_date": "2013-06-30", "end_date": "2014-03-30", "raw_data": 38823}}]
Jan. 28, 2023, 10:51 a.m. Added 35 {"external_links": []}
April 11, 2022, 3:45 a.m. Created 43 [{"model": "core.projectfund", "pk": 17286, "fields": {"project": 2370, "organisation": 4, "amount": 61885, "start_date": "2013-06-30", "end_date": "2014-03-30", "raw_data": 10209}}]
April 11, 2022, 3:45 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 64895, "fields": {"project": 2370, "organisation": 623, "role": "PARTICIPANT_ORG"}}]
April 11, 2022, 3:45 a.m. Created 41 [{"model": "core.projectorganisation", "pk": 64894, "fields": {"project": 2370, "organisation": 623, "role": "LEAD_ORG"}}]
April 11, 2022, 3:45 a.m. Created 40 [{"model": "core.projectperson", "pk": 39995, "fields": {"project": 2370, "person": 3236, "role": "PM_PER"}}]
April 11, 2022, 1:47 a.m. Updated 35 {"title": ["", "66kV Collector Interface for HVDC"], "description": ["", "\nFeasibility study for 66kV inter-array collector networks to allow for more cost effective power collection and connection to HVDC transmission links for large remote offshore wind power parks. The industry is currently installing inter-array networks that operate at 33kV, with the non-availability of slim-line switchgear, transformers and wet-type cables preventing the evolution of these systems to higher voltage levels. The benefits of using 66kV inter array networks include (1) smaller cables to carry the same power (2) lower operating losses as the transmission currents are lower with the higher operating voltage, and (3) potentially fewer offshore AC collector substations.\nThis project will deliver a detailed techno-economic feasibility assessment of the opportunity that the adoption of 66kV collector systems could bring for large wind farms connected through HVDC systems.\n\n"], "extra_text": ["", "\n\n\n\n"], "status": ["", "Closed"]}
April 11, 2022, 1:47 a.m. Added 35 {"external_links": [8480]}
April 11, 2022, 1:47 a.m. Created 35 [{"model": "core.project", "pk": 2370, "fields": {"owner": null, "is_locked": false, "coped_id": "2e2a0e4d-0d9c-4c4b-b5d7-36528610338e", "title": "", "description": "", "extra_text": "", "status": "", "start": null, "end": null, "raw_data": 10195, "created": "2022-04-11T01:33:45.358Z", "modified": "2022-04-11T01:33:45.358Z", "external_links": []}}]