Leading Edge For Turbines (LEFT)
Find Similar History 37 Claim Ownership Request Data Change Add FavouriteTitle
Leading Edge For Turbines (LEFT)
CoPED ID
f12aa2a4-af72-4566-999e-c36bbeea030b
Status
Closed
Funders
Value
£1,408,908
Start Date
March 31, 2018
End Date
Dec. 31, 2020
Description
"This project aims at maturing to TRL 5 a game changing erosion protection solution for large offshore wind turbine blades utilising a technology currently produced for the aerospace industry, namely that of the metallic lifetime erosion protection shield. In order to integration this solution in large 80m+ 30ton+, highly flexible wind turbine blades with 30 year design lifetime, the following key challenges are addressed in the proposal:
- modulating the erosion shield material for this demanding application,
- modelling and validating the attachment solution between the metallic shield and the blade up to TRL 5 (adhesive characterisation, subcomponent test, leading edge component test)"
Radius Aerospace UK Limited | LEAD_ORG |
Performance Engineered Solutions (Pes) Limited | PARTICIPANT_ORG |
Offshore Renewable Energy Catapult | PARTICIPANT_ORG |
Radius Aerospace UK Limited | PARTICIPANT_ORG |
Doncasters Limited | PARTICIPANT_ORG |
Chris Taylor | PM_PER |
Chris Taylor | PM_PER |
Subjects by relevance
- Erosion
- Wind energy
- Testing
- Wind power stations
- Game industry
Extracted key phrases
- Metallic lifetime erosion protection shield
- Large offshore wind turbine blade
- Erosion protection solution
- Flexible wind turbine blade
- Erosion shield material
- Metallic shield
- Attachment solution
- Adhesive characterisation
- Year design lifetime
- Subcomponent test
- TRL
- Project
- Edge