Title
Leading Edge For Turbines (LEFT)

CoPED ID
f12aa2a4-af72-4566-999e-c36bbeea030b

Status
Closed


Value
£1,408,908

Start Date
March 31, 2018

End Date
Dec. 31, 2020

Description

More Like This


"This project aims at maturing to TRL 5 a game changing erosion protection solution for large offshore wind turbine blades utilising a technology currently produced for the aerospace industry, namely that of the metallic lifetime erosion protection shield. In order to integration this solution in large 80m+ 30ton+, highly flexible wind turbine blades with 30 year design lifetime, the following key challenges are addressed in the proposal:

- modulating the erosion shield material for this demanding application,

- modelling and validating the attachment solution between the metallic shield and the blade up to TRL 5 (adhesive characterisation, subcomponent test, leading edge component test)"

Chris Taylor PM_PER
Chris Taylor PM_PER

Subjects by relevance
  1. Erosion
  2. Wind energy
  3. Testing
  4. Wind power stations
  5. Game industry

Extracted key phrases
  1. Metallic lifetime erosion protection shield
  2. Large offshore wind turbine blade
  3. Erosion protection solution
  4. Flexible wind turbine blade
  5. Erosion shield material
  6. Metallic shield
  7. Attachment solution
  8. Adhesive characterisation
  9. Year design lifetime
  10. Subcomponent test
  11. TRL
  12. Project
  13. Edge

Related Pages

UKRI project entry

UK Project Locations