Next generation offshore wind turbine monopile foundation installation drill.

Find Similar History 34 Claim Ownership Request Data Change Add Favourite

Title
Next generation offshore wind turbine monopile foundation installation drill.

CoPED ID
bf982259-55a6-4314-b237-f4a756e0198a

Status
Closed


Value
£198,956

Start Date
Nov. 1, 2020

End Date
April 29, 2021

Description

More Like This


LDD will develop the next generation of wind turbine installation drilling equipment supporting a reduction in the Levelized Cost Of Energy (LCOE) for fixed offshore wind.

Offshore Wind Developers are planning for bigger and more powerful wind turbine generators, requiring much larger steel monopile foundations to support increased design loads. LDD in consultation with Offshore Wind Developers has identified that the world's current drilling capacity, including LDD's own designed and built drilling equipment, is insufficient to drill these new larger foundations, efficiently and economically.

LDD will use its in-house design capability, coupled with market leading drilling experience and adoption of new, applicable and complementary technologies, to develop a drilling system to facilitate the installation of the next generation of offshore Wind farm.

Subjects by relevance
  1. Wind energy
  2. Wind power stations
  3. Renewable energy sources
  4. Wind farms
  5. Planning and design
  6. Wind generators
  7. Design (artistic creation)
  8. Turbines
  9. Wind turbines

Extracted key phrases
  1. Generation offshore wind turbine monopile foundation installation drill
  2. Wind turbine installation drilling equipment
  3. Powerful wind turbine generator
  4. Offshore Wind Developers
  5. Large steel monopile foundation
  6. Offshore Wind farm
  7. New large foundation
  8. Current drilling capacity
  9. Drilling system
  10. Drilling experience
  11. LDD
  12. House design capability
  13. Design load
  14. Levelized Cost
  15. Complementary technology

Related Pages

UKRI project entry

UK Project Locations