Title
Room Temperature Passive Heat Recovery with Heat Pipe

CoPED ID
ebd34050-598b-422d-aed4-8a55c00f5dc8

Status
Closed


Value
£1,230,185

Start Date
July 31, 2017

End Date
July 31, 2018

Description

More Like This


The results of Building Performance Evaluation Program, published by Innovate UK, identified that Schools consume 2 to 6 times more energy than designed. Recent research published by RIBA stated that UK Schools spend over £150,000,000 on energy consumed out of occupied hours, largely due to overly complex ventilation equipment. These findings are reinforced by CIBSE Journal reporting that new schools face excessive energy use, high running costs, poor operational effectiveness, with a large proportion of complex mechanical systems and renewables disabled, unused or abandoned due to the burden they place on the schools budgets and maintenance resources. Both CIBSE and RIBA point to complex mechanical hardware as a key contributor to these problems and the excessive costs involved, all at the time when School budgets are squeezed more than ever. In contrast, the Heat Pipe system designed by Ventive system is not only passive, but also possesses a simple and robust architecture. It can recover heat in winter, help to cool the building in the summer and seamlessly integrate into the building façade would greatly help to address the above reported energy inefficiency and high running costs. Ventive intends to prototype and test this system as part of this project.

VENTIVE LTD LEAD_ORG
VENTIVE LTD PARTICIPANT_ORG
BRUNEL UNIVERSITY LONDON PARTICIPANT_ORG

Tom Lipinski PM_PER

Subjects by relevance
  1. Buildings
  2. Energy efficiency
  3. Energy consumption (energy technology)
  4. Costs

Extracted key phrases
  1. Room Temperature Passive Heat Recovery
  2. Heat Pipe system
  3. Building Performance Evaluation Program
  4. Complex mechanical system
  5. Excessive energy use
  6. Ventive system
  7. High running cost
  8. School budget
  9. Complex mechanical hardware
  10. New school
  11. Energy inefficiency
  12. Complex ventilation equipment
  13. Excessive cost
  14. Innovate UK
  15. UK Schools

Related Pages

UKRI project entry

UK Project Locations