WakeBlaster - faster than real-time wind farm flow simulation for optimised operational control
Find Similar History 11 Claim Ownership Request Data Change Add FavouriteTitle
WakeBlaster - faster than real-time wind farm flow simulation for optimised operational control
CoPED ID
adfe9881-d7e2-4b65-bf40-9e2623e46894
Status
Closed
Value
£690,025
Start Date
Sept. 30, 2016
End Date
Sept. 30, 2017
Description
Almost all offshore and most onshore wind turbines are sited in wind farms where curtailments and wake
losses can be quite substantial. This feasibility project explores the creation of a technology base that enables
operators to increase the joint operational efficiency of wind turbines sited in wind farms. The envisaged
WakeBlaster technology delivers cost effective, faster than real-time, yet accurate modelling of even very large
wind farms. Control strategies based on WakeBlaster will lead to more efficient wind farms, reducing both
social cost and levelised cost of electricity.
PROPLANEN LIMITED | LEAD_ORG |
PROPLANEN LIMITED | PARTICIPANT_ORG |
No people listed.
Subjects by relevance
- Wind turbines
- Wind energy
- Wind farms
- Turbines
- Farms
- Costs
- Renewable energy sources
- Wind power stations
- Cost effectiveness
- Technology
Extracted key phrases
- Time wind farm flow simulation
- Efficient wind farm
- Onshore wind turbine
- WakeBlaster technology
- Operational control
- Joint operational efficiency
- Technology base
- Cost effective
- Control strategy
- Social cost
- Levelised cost
- Real
- Accurate modelling