Scour Prevention Trial Reference number

CoPED ID
7a0cc67d-e119-4ced-b1e0-a2c6906454c3

Status
Closed


Value
£533,870

Start Date
May 31, 2011

End Date
May 31, 2013

Description

More Like This


The aim of the project is to test the effectiveness of our patented anti-scour system. The deliverables will be a set of data
showing the (lack of) erosion around an offshore wind turbine once the system is in place, and a report analysing and
summarising the data.
• The work is being undertaken as, without it, there will be no evidence that it works, and as the installation is very capital
intensive, it will be difficult or even impossible to win orders without a robust set of data as proof that it works.
• The total cost of the project is expected to be £268,436.32 and will last around five months starting early April 2011. This
work will be carried out with the support of Eon plc at their wind farm on Scroby Sands near Great Yarmouth.

No people listed.

No subjects listed.

Extracted key phrases
  1. Scour Prevention Trial Reference number
  2. Offshore wind turbine
  3. Project
  4. Scour system
  5. Work
  6. Aim
  7. Datum
  8. Robust set
  9. Wind farm
  10. Total cost
  11. Eon plc
  12. Effectiveness
  13. Early April
  14. Anti

Related Pages

UKRI project entry

UK Project Locations