IV for Blackpool foundation design
Find Similar History 11 Claim Ownership Request Data Change Add FavouriteTitle
CoPED ID
Status
Value
Start Date
End Date
Description
We are developing a renewable wave energy device (“CCell”) based on a newly patented novel paddle shape. Laboratory tests show this extracts 2-3x more energy than existing designs. We now need to test a larger device in real waves.We have permission to install a trial device for a short period on the west coast of England (often call the "Energy Coast"). This project involve securing expert advise to design the base foundations, upon which our CCell device will be mounted, and supporting our activities during the trials. The trials will last for a period of 2-3 weeks (depending on wave conditions) and demonstrate our technology within a wide range of water depths that arise with the changing tide. Overall this represents a vital first step in the transition of our technology from the laboratory to the real environment.
ZYBA LIMITED | LEAD_ORG |
ZYBA LIMITED | PARTICIPANT_ORG |
Subjects by relevance
- Patents
Extracted key phrases
- Renewable wave energy device
- Blackpool foundation design
- Trial device
- CCell device
- Large device
- Base foundation
- Real wave
- Iv
- Wave condition
- Laboratory test
- Novel paddle shape
- Short period
- West coast
- Real environment