The project is designed to rebuild and catch-up the companies R&D activities, following C-19\. To grow the business creating jobs across engineering, manufacturing, construction. RheEnergise offers an opportunity for significant UK exports (licenced revenues and manufacture equipment).
High-Density-Hydro \[HDHydro\]: An electro-mechanical energy-storage solution that builds upon traditional pumped-hydro. Traditional pumped-hydro provides levelised costs of energy-storage significantly below (<50% lower) competing energy-storage technologies \[batteries\]. However projects take decades to complete. Traditional pumped-hydro uses low-cost electricity to pump huge volumes of water up mountains into a reservoir. As prices rise the water is released through turbines regenerating electricity to the national-grid. Projects need huge water volumes, mountains \[often remote/ protected areas\] and large-scale grid infrastructure, creating social and environmental concerns.
HDHydro is different. RheEnergise has developed a new high-density, low-viscosity, environmentally-benign fluid (Rhe1809) with 2.5x the density of water. This means (if everything else stayed the same) RheEnergise projects provide 2.5x the power \[MW\] or 2.5x the energy \[MWh\] compared to water. It means projects are smaller (2.5x smaller volumetrically), built on low hills (2.5x lower) rather than mountains, connected to the existing distribution grid. As traditional pumped-hydro projects costs are ~65% civil engineering costs, a 60% saving in construction volumes is significant. Projects are physically similar in size as competing flexibility technologies (batteries, gas-peaking) and can be consented/ constructed in a similar 24-30 months. Lastly, levelised costs are comparable with traditional pumped-hydro (50% below batteries).
This project is an R&D catch-up project investigating those areas that have been adversely affected by C-19\. Five R&D areas:
1\. Fully characterise the environmentally benign high-density low-viscosity fluids rheology
2\. To optimise reversible-pump-turbine mechanical efficiency for the fluid
3\. To build a physical test-rig for seals design and seal arrangements for the fluid
4\. Physical Wear/ Abrasion tests to help system and sub-system specification
5: A supply and logistics study (costs and environmental) for the fluid raw materials.
Energy-storage projects commercial viability depend on several factors that inform levelised-costs: Capital-cost; Operational-costs; Round-trip efficiencies. This project addresses and improves upon each and in addition seeks to better understand Rheenergise's supply chain environmental footprint.
RHEENERGISE LIMITED | LEAD_ORG |
RHEENERGISE LIMITED | PARTICIPANT_ORG |
Stephen Crosher | PM_PER |
Subjects by relevance
- Projects
- Costs
- Optimisation
- Construction
Extracted key phrases
- High Density Hydro
- Hydro project cost
- Storage project commercial viability
- RheEnergise project
- New ip
- Company r&d activity
- R&d area
- New high
- Civil engineering cost
- Density low
- 2.5x low
- Levelised cost
- Huge water volume
- Cost electricity
- HDHydro