Title
PESO Resilience Fund
CoPED ID
1e09342d-89d0-4501-afb0-4e0a87daab43
Status
Closed
Value
£47,625
Start Date
Dec. 1, 2021
End Date
Jan. 31, 2022
Description
The PESO pilot system being deployed in Portsmouth International Port will integrate local electricity generation, novel energy storage and smart energy management to demonstrate how ports can meet emerging on-shore power demands and the requirements of ships as they increasingly use shore power and adopt electric propulsion whilst minimizing the need for expensive grid upgrading and optimising the use of variable tariffs.
Three main areas of innovation will be explored in the PESO pilot; the design and construction of novel dual-chemistry battery technology to meet the port requirements; advanced management software to optimise onsite energy generation and storage and the development of smart port grid infrastructure.
SWANBARTON LIMITED | LEAD_ORG |
SWANBARTON LIMITED | PARTICIPANT_ORG |
Christopher Price | PM_PER |
Subjects by relevance
- Smart grids
- Energy management
- Optimisation
- Ships
- Harbours
- Warehousing
- Software technology
- Renewable energy sources
- Shipping
- Software design
- Electricity tariffs
- Pilots (shipping)
- Energy technology
Extracted key phrases
- Peso pilot system
- PESO Resilience Fund
- Novel energy storage
- Portsmouth International Port
- Smart energy management
- Onsite energy generation
- Local electricity generation
- Smart port grid infrastructure
- Shore power demand
- Port requirement
- Advanced management software
- Novel dual
- Expensive grid upgrading