Title
Friction Flowmeter in Slurry Flows

CoPED ID
e614dc70-1992-450a-94b8-0643d9de7121

Status
Active


Value
£185,420

Start Date
June 30, 2023

End Date
Feb. 29, 2024

Description

More Like This


The project focusses on improving the accuracy of the friction flowmeter in slurry applications by incorporating a minimally intrusive acoustic sensor into the patented calculation method. This new sensor will provide an estimate of the solids content of the slurry so the impact on the measurement can be corrected. Additionally, it should provide more detailed information on the solids physical properties as well adding further insight into the process.

Slurry fluids are notoriously challenging to measure flow rate accurately because of the sensitivity to changes in physical properties and solids content. Having a system that can calculate these parameters as part of the measurement, eliminates the need for separate measurements and employing separate measurement corrections -- it's all done in the one device with the friction flowmeter.

Slurry type flows are expected to grow in coming years with the increasing demand of rare earth minerals used in renewable technologies as well as drilling applications for geothermal energy and carbon sequestration in underground storage reservoirs. Drilling can be a costly process, especially offshore in the North Sea where a drillship can be leased for over £2m per week for months at a time. Saving 10% of drilling time through better control and automation could save millions of pounds per year per installation which could be a huge financial stimulus for such an fledgling and important industry for the energy transition.

Subjects by relevance
  1. Friction
  2. Measurement

Extracted key phrases
  1. Friction Flowmeter
  2. Slurry type flow
  3. Slurry flow
  4. Slurry fluid
  5. Flow rate
  6. Separate measurement correction
  7. Solid physical property
  8. Slurry application
  9. Intrusive acoustic sensor
  10. Drilling application
  11. Solid content
  12. Patented calculation method
  13. New sensor
  14. Drilling time
  15. Well control