History of changes to: DURABILITY MODELLING OF COMPOSITE STRUCTURES WITH ARBITRARY LAY-UP USING STANDARDIZED TESTING AND ARTIFICIAL INTELLIGENCE
Date Action Change(s) User
Feb. 13, 2024, 4:19 p.m. Created 43 [{"model": "core.projectfund", "pk": 61970, "fields": {"project": 10159, "organisation": 11086, "amount": 622866, "start_date": "2023-01-01", "end_date": "2025-12-31", "raw_data": 175598}}]
Jan. 30, 2024, 4:24 p.m. Created 43 [{"model": "core.projectfund", "pk": 54813, "fields": {"project": 10159, "organisation": 11086, "amount": 622866, "start_date": "2023-01-01", "end_date": "2025-12-31", "raw_data": 150361}}]
Jan. 2, 2024, 4:15 p.m. Created 43 [{"model": "core.projectfund", "pk": 47609, "fields": {"project": 10159, "organisation": 11086, "amount": 622866, "start_date": "2023-01-01", "end_date": "2025-12-31", "raw_data": 130711}}]
Dec. 5, 2023, 4:23 p.m. Created 43 [{"model": "core.projectfund", "pk": 40361, "fields": {"project": 10159, "organisation": 11086, "amount": 622866, "start_date": "2023-01-01", "end_date": "2025-12-31", "raw_data": 95032}}]
Nov. 27, 2023, 2:14 p.m. Added 35 {"external_links": []}
Nov. 21, 2023, 4:36 p.m. Created 43 [{"model": "core.projectfund", "pk": 33065, "fields": {"project": 10159, "organisation": 11086, "amount": 622866, "start_date": "2023-01-01", "end_date": "2025-12-31", "raw_data": 54215}}]
Nov. 21, 2023, 4:36 p.m. Created 41 [{"model": "core.projectorganisation", "pk": 95338, "fields": {"project": 10159, "organisation": 12523, "role": "PARTICIPANT_ORG"}}]
Nov. 21, 2023, 4:36 p.m. Created 41 [{"model": "core.projectorganisation", "pk": 95337, "fields": {"project": 10159, "organisation": 12523, "role": "LEAD_ORG"}}]
Nov. 21, 2023, 4:36 p.m. Created 40 [{"model": "core.projectperson", "pk": 59791, "fields": {"project": 10159, "person": 13860, "role": "PM_PER"}}]
Nov. 20, 2023, 2:04 p.m. Updated 35 {"title": ["", "DURABILITY MODELLING OF COMPOSITE STRUCTURES WITH ARBITRARY LAY-UP USING STANDARDIZED TESTING AND ARTIFICIAL INTELLIGENCE"], "description": ["", "\nAdvanced composite manufacturing is becoming crucial in the global sustainable drive for a climate-neutral future as enabler of lightweight structures in, for example, the aerospace and wind energy sector. Their increased relevance has raised the importance of damage tolerance and durability of composite structures, currently dealt with time-consuming and inaccurate techniques. Hence the objective of D-STANDART is to develop fast and efficient methods to model the durability of large-scale composite structures with arbitrary lay-ups under realistic conditions (loads, environment). New test methodologies will be developed using generic specimens to correctly quantify material parameters that determine the durability of composites under cyclical loading. Material characterisation will be used in highfidelity models to simulate defect growth in various lay-ups and at various scales as a function of cyclical loading and rate. To apply these models in an industrial design environment, D-STANDART will make use of Artificial Intelligence (AI) surrogate models, trained using test data from the project and historical test data to easily adapt to different design parameters and complex lay-ups, thereby accelerating the development, uptake, and commercialisation of advanced components. Two use cases have been selected to validate the modelled durability performance both in the aerospace and renewable energy sectors. Furthermore, circularity and sustainability will be assessed via dedicated life-cycle assessment, life cycle costing and cost-benefit analysis. This 36-month \u20ac5.6M valued action involves, 9 partners (3 universities, 2 RTOs, 2 industry, and 2 SMEs) from four countries (United Kingdom, The Netherlands, Germany, and France). The consortium will be supported by an Advisory Board formed of 6 End users embracing the value chain to validate requirements, guide on relevant approach to certification, and finally support results uptake, in tight alignment with EMCC.\n\n"], "extra_text": ["", "\n\n\n\n"], "status": ["", "Active"]}
Nov. 20, 2023, 2:04 p.m. Added 35 {"external_links": [41976]}
Nov. 20, 2023, 2:04 p.m. Created 35 [{"model": "core.project", "pk": 10159, "fields": {"owner": null, "is_locked": false, "coped_id": "4a480214-610f-4478-9c9f-df9acc6bbee6", "title": "", "description": "", "extra_text": "", "status": "", "start": null, "end": null, "raw_data": 54198, "created": "2023-11-20T13:37:45.519Z", "modified": "2023-11-20T13:37:45.519Z", "external_links": []}}]